BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2026 at 7:00 PM

Updated February 7, 2026

Demolition, site work and addition to a mixed-use development in Colquitt, Georgia. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.

This project will consist of site development and construction of the following projects; 1) New construction of an Event Center to accommodate middle school basketball. Approximate square footage of 10,500. 2) Renovation of an existing gymnasium to create an athletic facility. Approximate square footage of 21,000. 3) Construct a new 400m running track at the high school. 4) New addition at Miller County PK-12 School to house an automotive lab and classroom. Approximate square footage of 4,000. 5) Various site, building, and field improvements at the existing baseball and softball complex. Anticipated Construction Begin/End Date January 2027 to February 2028 The selected Contractor will be required to provide a 100% Payment Bond and 100% Performance Bond for the entire amount of the cost of construction. Question Deadline 03/01/2026 Please direct all questions regarding this RFP to; Travis Petitjean with Altman + Barrett Architects and Michael Keown with Miller County School District., tpetitjean@altmanbarrettarchitects.com and michael.keown@miller.k12.ga.us. The MCSD reserves the right to select or reject any and all responses as a result of this Request for Proposal. The MCSD is not liable for any costs incurred by any person or firm responding to this Request for Proposal. RFP date and bid date description: To be accepted, all responses must be submitted in a sealed package marked "Proposal for Miller County School District - Facility Additions and Improvements - Construction Professional". This project will consist of site development and construction of the following projects; 1) New construction of an Event Center to accommodate middle school basketball. Approximate square footage of 10,500. 2) Renovation of an existing gymnasium to create an athletic facility. Approximate square footage of 21,000. 3) Construct a new 400m running track at the high school. 4) New addition at Miller County PK-12 School to house an automotive lab and classroom. Approximate square footage of 4,000. 5) Various site, building, and field improvements at the existing baseball and softball complex.

GC Bidding

Educational

$9,500,000.00

Public - County

Addition, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
56
Bidding Soon
617
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2026

October 31, 2026

Project location map

Multiple Locations, Colquitt, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.