BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 11, 2026 at 7:00 PM

Updated February 12, 2026

Site work, outdoor lighting and renovation of a mixed-use development in Providence, Rhode Island. Completed plans call for site work for a bridge / tunnel; for outdoor lighting for a bridge / tunnel; for the renovation of a municipal facility; municipal facility; municipal facility; sidewalk / parking lot; and sidewalk / parking lot.

The Department of Administration, Division of Capitol Asset Management and Maintenance is seeking quotes from qualified vendors to repair the ADA Tunnel entrance as well as the retaining walls at the RIDOT Building in Providence, RI. For more information, a. when viewing from public bid board, click on the "print/download solicitation" button in the upper right corner of this window, or b. vendor can login to their Web Procure account to view this solicitation in full. The overall scope of work includes but not limited to the following: 1. The removal of an existing elevated exterior concrete slab and railing at the east side of the property. The concrete slab is the ceiling of the exterior accessible entrance. A new reinforced concrete slab and guardrail will be installed in its place. 2. The accessible exterior entrance tunnel walls and floor will be cleaned. Patch parging at tunnel walls. Exterior lighting will be added. Underside of the new reinforced concrete slab (ceiling) will be painted. Existing concrete floor slab will be cleaned and stained. The tunnel walls will be primed and painted. 3. Removal of the existing east areaway retaining walls, areaway slab, guardrail and concrete sidewalk adjacent to the areaway retaining walls. New concrete areaway retaining walls and slab will be constructed to replace the demolished walls and slab. In slab drain and grate added to connect to existing subsurface drainage. Modifications to adjacent grade to improve site drainage. Re grading and seed at any disturbed earth. New guardrail installed. 4. Removal of existing granite retaining walls at the west areaway and floor slab and stairs. A concrete wall will be installed in the location behind the existing granite walls. Existing granite walls will be reinstalled and pinned to the new concrete wall. New stairs and handrails will be installed. Existing guardrails will be removed and replaced with new galvanized metal guardrails. Modifications to existing grade. In slab drain and grate added to connect to existing subsurface drainage. Regrading and seed any disturbed areas of earth. 5. Cleaning of all existing granite at the exterior building façade. 6. Installation of new perforated drainpipes and connection to existing subsurface drainage.

Bid Results

Municipal

$554,667.00

Public - State/Provincial

Outdoor Lighting, Renovation, Site Work

21

19

21

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
5
Bidding Soon
2,265
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2026

March 1, 2026

Project location map

2 Capitol Hill, Providence, RI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.