BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 9, 2026 at 7:00 PM

Updated February 10, 2026

Site work and paving for a mixed-use development in Rochester Hills, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Reference Number 0000411783 South Adams Pathway Connections Scope of Work includes (but not limited to): Construction of pathway along South Adams Road between Forester Boulevard and a new connection to the Clinton River Trail to the east and along the west side of Old Adams Road between two existing dead-end sections of pathway. Specific work includes but is not limited to: clearing, grading, asphalt pathway installation, concrete ADA ramp installation, aggregate base placement; installation of new asphalt pavement, concrete curb and gutter, drive approach placement, pavement markings, and general project restoration. Project Plans are provided in Appendix A. Question Acceptance Deadline 02/20/2026 11:30 AM EST Questions are submitted online No General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 25 % - Payment Bond 100 % Bid Opening Via Zoom Teleconference Bidders wanting to view the opening are invited to do so utilizing the following meeting information listed below. We are requesting that you not attend in person to limit capacity within City building during this time and it is possible that City buildings may not be open to the public at the time of the opening.

GC Bidding

Sidewalks / Parking Lot

$300,000.00

Public - City

Paving, Site Work

29

22

2

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
534
Active Projects
330
Bidding Soon
2,412
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2026

April 3, 2026

Project location map

Multiple Locations, Rochester Hills, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.