Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 11, 2026 at 7:00 PM
Updated February 12, 2026
Demolition, site work, paving and new construction of a mixed-use development in San Carlos, California. Completed plans call for the demolition of a office development; for the construction of a 12,592-square-foot, one-story above grade office development; for site work for a office development; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The Department of Public Works (Department) is seeking a contractor for the 795 Skyway Road Building Replacement Project (Project). The work to be done consists, in general, of providing all labor, materials, tools, appurtenances, and equipment required as well as any other items and details not mentioned but required by the Contract Documents and as directed by the Director of Public Works or designee. The target start date and term for the proposed services are subject to negotiation of a final agreement, through the completion of the Project. The Contract Time for completion of all the Work of the Project is Four Hundred Fifty-Seven (457) calendar days, as defined as sufficiently complete in accordance with the Contract Documents. The existing building at 795 Skyway Road is a 7,977sf type V-B construction facility which houses tenant spaces sharing a central restroom area and having one interior restroom area for a single suite. The original building along with its mechanical, electrical and plumbing equipment and fixtures will be demolished in its entirety. The new 795 Skyway Road building is a 12,592sf building of Type II-B construction which houses business occupancy and a small are of classroom space. The overall space is divided into (5) tenant suites. The facility is a single story, metal building with 2 equipment platform structures and a clerestory roof and exterior wall system are metal panel construction with ribbon windows framed to the rigid frames of the metal building's lateral support system. Existing parking lot will be repaved, including accessible parking stalls. The Tenant Improvement of Suite 1 through 5 to be reviewed and approved under separate permits. Question Deadline 02/20/2026 at 2:00 PM PT Responses to Questions: February 23, 2026, 2:00pm. Questions regarding this project should be directed to the Authorized Contact Person: Michael Byrne - Airport Manager Department of Public Works - Airports 650 Airport Way. Ste. 10 San Carlos, California 94070 Office Email: Airports@smcgov.org The Board of Supervisors of the County of San Mateo, State of California, reserves the right to reject any and all bids, alternate bids, or unit prices and waive any irregularities in any bid received. No bidder may withdraw his bid for a period of ninety (90) days after the date set for the opening thereof. Engineer's Estimate Range: $10,000,000-$11,500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
Office
$11,500,000.00
Public - County
Demolition, New Construction, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
30
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 2, 2026
March 11, 2026
795 Skyway Rd, San Carlos, CA
Related To This Project
San Carlos, CA
Bid Date: Mar 09 2026
San Carlos, CA
Bid Date: Feb 17 2026
San Carlos, CA
Bid Date: Feb 19 2026
San Carlos, CA
Bid Date: Mar 25 2026
San Carlos, CA
Bid Date: Jan 20 2026
San Carlos, CA
Bid Date: Jan 21 2026
San Carlos, CA
Bid Date: Feb 17 2026
San Carlos, CA
Bid Date: Oct 31 2025
San Carlos, CA
Bid Date: Jun 21 2019
San Carlos, CA
Bid Date: Sep 11 2020
San Carlos, CA
Bid Date: Sep 02 2025
San Carlos, CA
Bid Date: Sep 02 2025
San Carlos, CA
Bid Date: Jul 28 2025
San Carlos, CA
--
San Carlos, CA
Bid Date: Jun 25 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
