BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 18, 2026 at 8:00 PM

Updated March 19, 2026

Renovation of a mixed-use development in Albertson, New York. Completed plans call for the renovation of a 2,756-square-foot, one-story above grade educational facility.

Henry Viscardi School at the Viscardi Center Locker Room & Boiler Room Upgrades The Owner reserves the right to reject any or all bids, waive any informality and to accept such bid which, in the opinion of the Owner, is in the best interests of the School Question Deadline 03/06/2026 questions must be received in writing at least three (3) days prior to the date fixed for the opening of bids. Every request for such interpretation shall be made in writing, addressed to: Joseph L. Mile, AIA Assistant Studio Director | Associate H2M Architects + Engineers 538 Broad Hollow Road, 4 th Floor East Melville, NY 11747 Phone: (631) 756-8000 x1161 Fax: (631) 694-4122 E-mail: jmile@h2m.com A. Furnish all labor, equipment, materials, tools, means, methods, and incidentals necessary to complete the Work as required by the Contract Documents for this Construction Contract. Each contractor shall coordinate, through the Owner/Architect/Engineer, the work of their contract with the work by others. B. This following abbreviated summary is provided in order to briefly describe the work covered by the Contract Documents for this Construction Contract. It is not all inclusive of the work under the Contract. C. The work includes, but is not limited to, the following: 1. Renovation of the existing locker rooms. 2. Demolition and removals as shown in the contract documents. 3. Coordination with Contract P work. 4. Coordination with Contract M work. 5. Coordination with Contract E work. 6. Project as-builts. 7. Project closeout submittals. D. All other work shown and specified within the Contract Documents for Contract G. Bids must be made in the standard proposal form in the manner designated therein and as required by the Specifications that must be enclosed in sealed envelopes bearing the name of the job and name and address of the bidder on the outside, addressed to: HENRY VISCARDI SCHOOL, clearly marked on the outside: Bid For: Henry Viscardi School Locker Room & Boiler Room Upgrades.

Bid Results

Educational

$642,500.00

Public - City

Renovation

61

17

31

7

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
283
Active Projects
27
Bidding Soon
4,295
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2026

April 6, 2026

Project location map

201 I U Willets Rd, Albertson, NY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.