BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 8, 2026 at 7:00 PM

Updated February 9, 2026

Remodeling of a municipal facility in East Saint Louis, Illinois. Completed plans call for the remodel of a municipal facility.

City of East St. Louis ("City") is issuing this REQUEST FOR RFB ("RFB") This Request for Sealed Bids is for the purpose of, contracting with qualified Contractors to provide remodeling services If you have any questions pertaining to the east st. Louis township, please contact township manager, roy mosley, jr estitownshlo feaststlouistownshin.Net (618) 515-2150 If you have any questions pertaining to the bidding process, please contact director of purchasing, tereyowna martin martin@cesi (618) 600-1919 and/or purchasing manager ineater fleming ifleming@cesi.Us (618) 600-4704 Bidders must have business license, proof of insurance, and w-9 Men's Bathroom East Wing Remodel- Remove and replace all tile flooring o Remove and replace all tiles on walls . (tiles are to be installed 4 ft high only ) o Paint all walls 2 coats o Remove and replace ceiling tiles and grid . ( be sure ceilings are 8ft high ) o Remove and replace heat / ac diffuser o Remove and replace all lighting (led Lighting preferred ) . Remove and replace ventilation / exhaust fan . Remove and replace toilet partitions Install dividers / partitions to separate urinals o Remove and replace all toilets and urinals . (automatic flush toilets and urinals ) . Remove and replace all fixtures in stalls . (toilet tissue dispenser , toilet seat cove dispenser, handicap bars etc.) o Remove and replace bathroom mirror . ( one single mirror ) o Remove and replace 12v hand blower and additional blower o Remove and Replace trashcan with paper towel dispenser o Remove and replace mechanical paper towel dispenser with automatic dispenser and add additional dispenser . (2 dispensers ) o Remove and replace bathroom door and fixtures o Please be sure that bathrooms will meet code for handicap stalls and accessories Women's Bathroom East Wing Remodel Remove and replace all tile flooring o Remove and replace all drywall in bathroom . (Flat walls , no texture ) . Paint all walls 2 coats o Remove and replace all tiles on walls . (tiles are to be installed 4 ft high only ) o Remove and replace ceiling tiles and grid . (be sure ceilings are 8ft high ) o Remove and replace all lighting (led Lighting preferred ) o Remove and replace heat / ac diffuser o Remove and replace ventilation / exhaust fan o Remove and replace toilet partitions Remove and replace all fixtures in stalls . (toilet tissue dispenser , toilet seat cove dispenser , handicap bars etc. ) o Remove and replace bathroom mirror . (one single mirror ) o Remove and replace 12v hand blower and additional blower o Remove and Replace trashcan with paper towel dispenser o Remove and replace mechanical paper towel dispenser with automatic dispenser and add additional dispenser . (2 dispensers ) o Remove and replace bathroom door and fixtures o Please be sure that bathrooms will meet code for handicap stalls and accessories Men's Bathroom Middle Wing Remodel o Remove and replace all tile flooring Remove and replace all drywall in bathroom . ( Flat walls , no texture ) Paint all walls 2 coats Remove and replace all tiles on walls . (tiles are to be installed 4 ft high only ) Remove and replace ceiling tiles and grid . (be sure ceilings are 8ft high ) Remove and replace all lighting (led Lighting preferred ) o Remove and replace heat / ac diffuser o Remove and replace ventilation / exhaust fan o Remove and replace toilet partitions Remove and replace all toilets and urinals . (automatic flush toilets and urinals ) Remove and replace all fixtures in stalls . (toilet tissue dispenser , toilet seat cove dispenser , handicap bars etc. ) . Remove and replace bathroom mirror . (one single mirror ) . Remove and replace 12v hand blower and additional blower o Remove and Replace trashcan with paper towel dispenser o Remove and replace mechanical paper towel dispenser with automatic dispenser and add additional dispenser . (2 dispensers ) o Remove and replace bathroom door and fixtures o Please be sure that bathrooms will meet code for handicap stalls and accessories Women's Bathroom Middle Wing Remodel o Remove and replace all tile flooring o Remove and replace all drywall in bathroom . ( Flat walls , no texture ) o Paint all walls 2 coats o Remove and replace all tiles on walls . (tiles are to be installed 4 ft high only ) o Remove and replace ceiling tiles and grid . ( be sure ceilings are 8ft high ) o Remove and replace all lighting (led Lighting preferred ) . Remove and replace heat / ac diffuser o Remove and replace toilet partitions Remove and replace ventilation / exhaust fan o Remove and replace all toilets and urinals . (automatic flush toilets and urinals ) o Remove and replace all fixtures in stalls . (toilet tissue dispenser , toilet seat cove dispenser , handicap bars etc. ) o Remove and replace bathroom mirror . (one single mirror ) o Remove and replace 12v hand blower and additional blower o Remove and Replace trashcan with paper towel dispenser o Remove and replace mechanical paper towel dispenser with automatic dispenser and add additional dispenser . (2 dispensers ) o Remove and replace bathroom door and fixtures o Please be sure that bathrooms will meet code for handicap stalls and accessories Men's Bathroom West Wing Remodel o Remove and replace all tile flooring Remove and replace all drywall in bathroom . ( Flat walls , no texture ) Paint all walls 2 coats o Remove and replace all tiles on walls . (tiles are to be installed 4 ft high only ) . Remove and replace ceiling tiles and grid . (be sure ceilings are 8ft high ) Remove and replace all lighting (led Lighting preferred ) . Remove and replace heat / ac diffuser o Remove and replace ventilation / exhaust fan o Remove and replace toilet partitions Remove and replace all toilets and urinals . (automatic flush toilets and urinals ) Remove and replace all fixtures in stalls . (toilet tissue dispenser , toilet seat cove dispenser , handicap bars etc. ) Remove and replace bathroom mirror . ( one single mirror ) Remove and replace 12v hand blower and additional blower . Remove and Replace trashcan with paper towel dispenser . Remove and replace mechanical paper towel dispenser with automatic dispenser and add additional dispenser . (2 dispensers ) o Remove and replace bathroom door and fixtures o Please be sure that bathrooms will meet code for handicap stalls and accessories Women's Bathroom Middle Wing Remodel o Remove and replace all tile flooring . Remove and replace all drywall in bathroom . (Flat walls , no texture ) o Paint all walls 2 coats o Remove and replace all tiles on walls . (tiles are to be installed 4 ft high only ) o Remove and replace ceiling tiles and grid . (be sure ceilings are 8ft high ) o Remove and replace all lighting (led Lighting preferred ) o Remove and replace heat / ac diffuser . Remove and replace ventilation / exhaust fan Remove and replace toilet partitions Remove and replace all toilets and urinals . (automatic flush toilets and urinals ) Remove and replace all fixtures in stalls . (toilet tissue dispenser , toilet seat cove dispenser , handicap bars etc. ) Remove and replace bathroom mirror . (one single mirror ) Remove and replace 12v hand blower and additional blower . Remove and Replace trashcan with paper towel dispenser Remove and replace mechanical paper towel dispenser with automatic dispenser and add additional dispenser . (2 dispensers ) . Remove and replace bathroom door and fixtures . Please be sure that bathrooms will meet code for handicap stalls and accessories Mop Sink Room Remodel . Remove and replace Mop sink Repair walls and ceiling o Paint all walls and ceilings 2 coats o Remove and replace stainless steel protector on wall Remove and replace all dispensers in room Clean concrete floor scrub concrete floor to original finish

GC Bidding

Municipal

$100,000.00

Public - City

Remodeling

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
297
Active Projects
156
Bidding Soon
1,443
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2026

March 23, 2026

Project location map

To Be Determined, East Saint Louis, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.