Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 16, 2026 at 7:00 PM
Updated February 17, 2026
Site work for a civil project in Arlington, Texas. Completed plans call for site work for a water / sewer project.
Estimate: $25 to $30M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The deadline to ask questions is 3/05/2026 2:00 PM CST DIRECT ALL QUESTIONS REGARDING DISTRIBUTION OR DESIGN of Contract Documents for this Project through online. Only responses issued via Addenda are binding. The project scope includes, but is not limited to, the following major work items: Structural improvements and rehabilitation at Equalization Basin (EQB) Nos. 1-6; Replacememt of an 18-inch drain line, butterfly valve and appurtenances in Valve Vault 3D (VV#D), in addition to replacement of 18-inch piping and a new manhole downstream of the vault; Installation of manual water cannons and replacement of W3 water piping and appurtenances at EQB Nos. 1-6; Replacement of two 72-inch butterfly valvles and actuators upstream of he EQB Nos. 1 & 2 and 3 & 4 splitter boxes, along with installation of new access manways; Replacement of four 60-inch butterfly gates with 60-inch slide gates and electric actuators at the EQB Nos. 1 & 2 and 3 & 4 splitter boxes, along with associated electrical improvements; Structural improvements and rehabilitation at the Onsite Storage Basin (OSSB); Improvements to the basin cleaning system at the OSSB, including replacement of the existing five butterfly gates on the OSSB partition wall with slide gates and installation of two new slide gates on the OSSB partition wall, along with associated electrical and instrumentation and controls improvements; Improvements to the OSSB underdrain system; Installation of manual water cannons on the OSSB partition wall; Abandonment of the existing underdrain pump stations within the OSSB and construction of a new underdrain/sump pump station south of the OSSB, along with all associated piping, including microtunneling, fill and grading, electrical and instrumentation for a functional pump station; Replacement of the effluent trough covers at Primary Clarifier 5-8 (PC5-8); Replacement of electric actuators on the influent slide gates at the PC5-8 splitter box; Replacement of the EQB Nos. 5 and 6 effluent (step feed) flow meter; Repairs to the Contruction Management Trailer; Replacement of Motor Control Center No. 3 (MCC-3); and Replacement of Substation J. Anyone wanting to attend the Pre-Bid Conference must give 24 hours prior notice to Soon Wong, wongsm@trinityra.org, 469-858-8333 cell, providing name, company representing, purpose (Pre-Bid Conference), and time of arrival.
GC Bidding
Water / Sewer
$30,000,000.00
Public - State/Provincial
Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 12, 2026
May 11, 2026
Multiple Locations, Arlington, TX
Related To This Project
Arlington, TX
Bid Date: Mar 03 2026
Arlington, TX
Bid Date: Feb 26 2026
Arlington, TX
--
Arlington, TX
Bid Date: Feb 25 2026
Arlington, TX
--
Arlington, TX
--
Arlington, TX
--
Arlington, TX
--
Arlington, TX
Bid Date: Aug 21 2026
Arlington, TX
Bid Date: Feb 19 2026
Arlington, TX
--
Arlington, TX
Bid Date: Feb 25 2026
Arlington, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.