Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 31, 2026 at 8:00 PM
Updated April 1, 2026
Renovation of a detention facility in Chicago, Illinois. Completed plans call for the renovation of a detention facility.
The project requires furnishing all equipment, materials, and labor to completely replace two existing Hermetic Natural Gas Boosters installed in the late 1980s. Work includes removing the existing boosters; installing new gas boosters with new isolation valves; providing new variable frequency drives (VFDs) for each booster that modulate based on gas demand; integrating the new VFDs into the existing Building Automation System; and providing new electrical supply for each booster. The two boosters operate in tandem and rotate on a manual schedule and will be replaced in full under this requirement. The performance period for completion is 235 calendar days from the notice to proceed. Location: Metropolitan Correctional Center Chicago, 71 W. Van Buren Street, Chicago, IL 60605 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
Jails / Prisons
$250,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 27, 2026
May 7, 2026
71 W Van Buren St, Chicago, IL
Related To This Project
Chicago, IL
Bid Date: Mar 31 2026
Chicago, IL
--
Chicago, IL
Bid Date: Apr 14 2026
Chicago, IL
Bid Date: Apr 14 2026
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: May 13 2026
Chicago, IL
--
Chicago, IL
Bid Date: Apr 24 2026
Chicago, IL
Bid Date: Mar 26 2026
Chicago, IL
Bid Date: Apr 09 2026
Chicago, IL
--
Chicago, IL
Bid Date: Apr 24 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
