BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 16, 2026 at 7:00 PM

Updated February 17, 2026

Site work for a sidewalk / parking lot in Lakeville, Minnesota. Completed plans call for site work for a sidewalk / parking lot.

The project includes the furnishing of all labor and materials for the construction, complete in-place, of the following approximate quantities: 7,100 linear feet of remove and replace concrete curb and gutter; 8,600 square feet of remove and replace concrete walk; 37,200 square yards of mill bituminous surface; 4,500 square yards of full depth reclamation; 5,350 square yards of trail removal and paving; 1,350 square yards of parking lot removal and paving; 4,515 tons of Type SP 9.5 Wearing Course Mix (3,C); 1,000 tons of bituminous patch special; 100 each adjust rame & ring casting (sanitary & storm); 802 square feet of prefabricated modular block retaining wall; 3,730 square feet of sheet pile wall; 25 each adjust gate valve; 80 linear feet of 4"-6" TP pipe drain; 700 linear feet of 15"-27" RC pipe; 3 each 15"-18" RC FES; 30 linear feet construct drainage structures DES 48-4020 & 72-4020; 2 each design special (2'x3'); 3,900 cubic yards common excavation; 3,900 cubic yards common embankment; 1,300 cubic yards subgrade excavation; 4,300 cubic yards excavation - channel and pond; 250 cubic yards structural backfill; 35,000 square yards seeding and restoration; 2,500 cubic yards aggregate base class 5. Bids must be submitted electronically using BidVAULT. Only registered planholders are allowed to bid. Bidders are responsible for all downloads, including addendums. The cost to submit a bid is $25 plus vendor convenience fee. Bids must be accompanied by a certified check or bid bond for 5% of the bid amount, to be forfeited as liquidated damages if the bidder fails to enter into a contract and furnish the required bond. The Owner reserves the right to reject any and all bids, waive informalities, or accept the bid that best serves the Owner's interests. No bids may be withdrawn for 60 days from opening. Contractors must meet the criteria for a "responsible contractor" as defined in Minn. Stat. 16C.285, subd. 3, and submit a signed statement under oath verifying compliance with the criteria. A prime contractor must provide verification from all subcontractors upon request. Submission of a false statement makes the contractor ineligible for award and may result in termination of the contract. Question Deadline 02/24/2026: All questions about the meaning or intent of the Contract Documents are to be directed to the Engineer. Questions received less than two (2) days prior to the date of opening of Bids may not be answered

GC Bidding

Sidewalks / Parking Lot

$2,000,000.00

Public - City

Site Work

176

22

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
311
Active Projects
190
Bidding Soon
1,655
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2026

April 1, 2026

Project location map

Multiple Locations, Lakeville, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.