Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 27, 2026 at 8:00 PM

Updated October 30, 2026

Site work, paving and new construction of a mixed-use development in Hartford, Connecticut. Completed plans call for the construction of a multi-residential development; for site work for a multi-residential development; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Trinity Financial, Inc. was selected by the Housing Authority of the City of Hartford (HACH) in October 2025 to serve as Co-Developer of the MSP Redevelopment. The overall MSP redevelopment contemplates the demolition of existing improvements and construction of approximately 159 multifamily rental units in 23 residential buildings, together with a community building, new streets, open space, parking, utilities and associated site improvements. The MSP redevelopment is planned as two principal construction phases: the 81-unit (MSP Phase 1) on the northern portion of the Site and the 78-unit (MSP Phase 2) on the southern portion of the Site. All questions must be submitted no later than 4:00 pm on November 17, 2026 and should be directed to jdickens@trinityfinancial.com and copied to bids@hartfordhousing.org. MSP Phase 1 Scope of Work MSP Phase 1 generally includes: 2.2.1 Hazardous-material abatement and demolition of the existing community building and five existing residential buildings identified in the Bidding Documents; 2.2.2 Environmental remediation and soil management within the MSP Phase 1 work area; 2.2.3 Construction of eleven three-story, wood-framed residential buildings containing a total of 81 rental units, consisting of (6) one-bedroom, (55) two-bedroom and (20) three-bedroom units; 2.2.4 Construction of an approximately 3,400-square-foot freestanding community building; 2.2.5 Construction of associated site improvements, including grading, landscaping, surface parking, pedestrian improvements, utilities, stormwater facilities, new Street C and new Street D and the portions of new Street A and new Street B included in the Bidding Documents. Streets A, B, C and D will be built on private land, but are intended for conveyance to the City once completed and accepted by the City; 2.2.6 Public-way and off-site improvements specified in the Bidding Documents, including required coordination with the City of Hartford, the Metropolitan District Commission, Eversource and applicable telecommunications and utility providers; 2.2.7 Coordination and installation of fire alarm, data, communications, security, accesscontrol and other low-voltage systems included in the Bidding Documents; 2.2.8 Temporary grading, access, protection, utility continuity and other measures required to maintain safe operation of the occupied portions of the MSP Redevelopment outside the MSP Phase 1 work area; and 2.2.9 All other labor, materials, equipment, supervision, coordination, testing, permits, services and incidental work required by the Bidding Documents for a complete and operational Project.

GC Bidding

$36,738,429.00

Public - City

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,199
Active Projects
429
Bidding Soon
7,241
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2026

February 8, 2027

Project location map

88 Wooster St, Hartford, CT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed