Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 25, 2026 at 7:00 PM

Updated February 26, 2026

Site work and paving for a sidewalk / parking lot in Independence, Missouri. Conceptual plans call for site work for a sidewalk / parking lot.

The City of Independence, Municipal Services Department, requests proposals from qualified consulting engineering firms to prepare preliminary engineering plans, right-of-way plans and legal descriptions, final plans, and bid documents for the Independence Square Streetscape - Phase 2 Project located in the heart of Independence, MO. Deadline for questions March 11, 2026, 5:00 p.m. local time Submit questions regarding this RFP online The method of Contractor Selection has not been Determined at this time.

Conceptual

Sidewalks / Parking Lot

$3,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
68
Bidding Soon
1,366
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2027

Project location map

Multiple Locations, Independence, MO

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed