Site work for a water / sewer project in La Sarre, Quebec. Completed plans call for site work for a water / sewer project.
Reference number: 20121290 Deadline for receipt of complaints 2026-02-23 There is provision for a tendering process for each tender No Electronic tender submission accepted Yes, via SEAO, with a document Expected duration of the contract without options (in months) 6 Delivery schedule 10.08.07 Completion deadline a) No machinery may be driven outside the construction site fencing, except on public roads and before buses have left the school zone. b) Demolition work must be carried out outside school hours, i.e. after 3:30 p.m. Reconstruction work may be carried out during normal daytime hours, provided that it does not interfere with school activities. b) Demolition work must be carried out outside of school hours, i.e. after 3:30 p.m. Reconstruction work may be carried out during normal daytime hours provided that it does not disturb the students. All outdoor work must be surrounded by construction fencing. c) The school will be unoccupied between July 3 and August 10, 2026. During this period, work may be carried out during normal working hours. However, as of August 21, the school will be occupied and used by staff and students during the construction period. Consequently, all work during this period will take place on weekdays from 3:30 p.m. to 7 a.m. and on weekends during normal hours. d) Please note that if more than one provisional acceptance visit and one final acceptance visit are required, the owner and/or professionals reserve the right to bill for the costs associated with additional travel and visits. e) All work must be completed by August 28 at the latest, including any deficiencies. The School Service Centre wishes to upgrade its drinking water treatment system for the Mancebourg building. A new well was drilled in 2025 and the parameters have changed. 1.1 GENERAL .1 The work must be carried out in accordance with the plans and the technical requirements of this specification. In the event of any contradiction between the sections of this specification and the applicable standards, the most stringent shall apply. .2 The work shall be carried out in accordance with best practices and within the specified time frame so as not to .2 The work shall be carried out in accordance with best practice and within the specified time frame so as not to delay the execution of the entire project. .3 Some piping accessories or equipment may only be shown on the process diagram. This equipment is an integral part of this division and shall be supplied and installed in the same way as the other equipment. 1.2 SCOPE OF WORK .1 The Contractor shall provide all materials, equipment, labor, tools, machinery, and all ancillary work required for the complete and functional installation of the piping and its accessories, as well as the equipment and instruments described and shown on the drawings. .2 The work also includes the commissioning of the equipment, all tests to be performed, and the training of personnel. The work also includes the commissioning of the equipment, all tests to be performed, and the training of personnel. .2 Unless specifically stated that the work will be performed or that the equipment will be supplied and installed by a third party, all equipment and materials mentioned in this division and on the related plans shall be supplied and installed by the Contractor of the this section and all work mentioned must be performed by him. .3 The Contractor shall be responsible for coordinating the supply and installation of all equipment in Division 44 00 00 with the other trades so as to avoid duplication in the supply and installation of equipment. .4 The work includes, but is not limited to: .1 Installation of the process mechanics of a drinking water treatment system, including: .1 Supply of a drinking water treatment system (section 44 10 11); .2 Supply of equipment to complete the drinking water treatment chain (section 44 50 05); .3 Supply and installation of taps, valves, measuring equipment, and their accessories (sections 44 40 00 and 44 42 00); .4 Supply and installation of piping and fittings, including their supports and accessories (section 44 45 00); .4 Supply and installation of piping and fittings, including supports and accessories (section 44 45 00); .5 All other related and complementary work not identified in the specifications but necessary for the complete execution of the project. .2 Preparation of shop drawings and assembly plans; .3 Testing and cleaning; .4 Commissioning and operator training; .5 Provision of warranties, operating manuals, and "Final Drawings"; .5 The following work is outside the scope of the contract: .1 Supply and installation of underground electrical conduits, including connections (Division 26 - Electrical); .2 Supply and installation of control panels, conduits, and underground control wiring, including connections (Division 17 - Instrumentation and Control).
Post-Bid
Water / Sewer
$400,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 24, 2026
July 17, 2026
To Be Determined, La Sarre, QC
Related To This Project
La Sarre, QC
Bid Date: Mar 23 2026
Abitibi-témiscamingue / CD La Sarre - Renovation of Car Park and Outdoor Electrical System - 6027625
La Sarre, QC
Bid Date: Mar 03 2026
La Sarre, QC
--
La Sarre, QC
Bid Date: Oct 15 2025
La Sarre, QC
Bid Date: Sep 23 2025
La Sarre, QC
Bid Date: Aug 22 2025
La Sarre, QC
Bid Date: Jul 28 2025
La Sarre, QC
Bid Date: Jun 30 2025
La Sarre, QC
Bid Date: Jun 11 2025
La Sarre, QC
Bid Date: Mar 18 2025
La Sarre, QC
--
La Sarre, QC
Bid Date: Nov 25 2024
La Sarre, QC
Bid Date: Nov 14 2024
La Sarre, QC
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.