Renovation of a multi-residential development in Baltimore, Maryland. Completed plans call for the renovation of a multi-residential development.
The Contractor shall supply all labor, material, supervision, equipment, insurance, and apply for all permits including U&O permit (Use of Occupancy Permit) The use and occupancy permit MUST be applied for within the 1st 30 days of receiving possession of property. All necessary permits must be applied for, obtained and completed as requested by HABC, in accordance with all applicable federal, state, and local regulations. The contractor shall and must comply with all EPA and MDE lead abatement regulations as required by law. Question Deadline 02/19/2026 at 2:00 PM ET Deadline to submit Questions electronically General: Upon Completion of unit all inspections should be completed and satisfied as required by local and state jurisdiction, the use and occupancy permit is to be handed over with the keys. 1. Remove and properly dispose of all Trash, Furniture and Miscellaneous Items in /on / near the Unit & Yard. (Satellite Dish, Cable wire…) 2. Remove all existing carpet padding E.T.C 3. Inspect all roofing and repair roof on unit as needed. 4. Remove all vegetation growing in and or around exterior of property. 5. All interior handrails must have returns on both ends of handrail. 6. Remove existing clotheslines in backyard and fill and repair any holes as needed. 7. Cut and trim grass and bushes in rear of unit. 8. Clean all cabinet and make repairs as needed. 9. Supply and install new handrails and paint (color: Black (brand: Rustoleum) on front right side of steps. (Front steps should have two handrails) 10. Supply and install new window blinds for all interior windows. 11. Install new metal exterior handrail secure & Paint Exterior handrails, and porch rails & AC cage. (Color: Black Brand: Rustoleum) (I.E Front steps should have two handrails) 12. Supply parts, repair and paint chain-link fence and gate. 13. Point up exterior steps and sidewalk cracks. 14. Supply and install A/C cage for condenser unit. 15. Parge and seal basement walls to prevent moisture infiltration and add moisture blocking paint (Paint: DryLock brand) 16. Epoxy basement floor as needed. 17. Install new exterior mailbox. (no keyed entry) 18. Caulk and/or repair any exterior / interior openings to prevent rodents from entering. 19. Supply and install new gutters and downspouts. (Extend backyard downspout 3ft-6ft from property) 20. Supply and install new Step treads and risers, (Remove carpet). 21. Supply and install new wooden handrails (Stain & poly) (DO NOT PAINT INTERIOR HANDRAILS) 22. Supply and install all NEW kitchen cabinets and countertops, including new kitchen sink and faucet, supply lines and shut off valves and escutcheon covers. Cabinets and countertops supplied by HABC. 23. Supply and install new Black range hood and Filter. 24. Supply and install new Black heat shield backsplash. 5. Final Cleaning of Entire Unit and Exterior to Make Ready for Occupancy, before final inspection. Bathrooms: 1. Supply and install two (2) Exhaust Fan bathroom. 2. Supply and install two (2) Fiberglass Vanity Bowl & Cabinet. 3. Supply and install two (2) new 16-inch elongated toilets and seats including new supply line, shut off valve and escutcheon cover. 4. Supply and install (two) (2) new steel bathtub with fixtures (As needed) 5. Replace all bathtub stoppers/pop-up drains as needed. 6. Supply and install ceramic tiles and thresholds on the bathroom, kitchen floor, and shower wall with cement backer board and/or Durock underlayment. Shower wall must be tiled all the way to the ceiling. Tiles must be 12x12 or bigger & wall tiles must be different from floor tiles. Superintendents must approve all tiles and 5% must be left over for future repairs. 7. Supply and install (2) Medicine Cabinet. 8. Supply and install all Bath accessories, non-UFAS. (Towel holder/s, Toilet Paper holder, Soap & Toothbrush…) 9. Supply and install two (2) Each Bathroom Vanity Faucet including shut-off valves, supply lines and escutcheon covers as needed. 10. Clean all bathrooms as needed. (Including grout and tile) Mechanical / Plumbing: 1. Supply and install a new Sump pump. 2. Supply and install Drain, Waste & Vents (All Bathrooms). 3. Check water heater for drainage pan if nonexistent then install new as needed. 4. Install all new handicap and ADA accessible fixtures in bathroom as needed to ADA Standards (American Disability Act) 5. Check and Inspect Gas Distribution (Stove, Water Heater, Furnace) and service and repair any leaks. 6. Inspect Water Distribution (Bathroom, Water Heater, Kitchen) for leaks, repair leaks throughout entire property ensure water pressure and flow is adequately restored and inspected. 7. Existing Water Heater to be REPLACED by certified technician as needed and any repairs are to be made as needed. 8. Remove Hose Bibs, supply materials and make repairs from removal. 9. Inspect Entire property and Repair (if necessary) all Drains, Water Distribution & Vent which includes / but not limited to Bathroom, Kitchen, Laundry, Sump & Condensation Pumps. All drains vents and waste ways must be free flowing and clear of debris; this is to include the mainline & any other drains present on property All drains MUST BE snaked or wet jetted to clear or remove any debris ifnecessary. 10. Service existing sprinkler system as needed (Service receipt to be provided to superintendent.) 11. Replace existing HVAC System as needed (Service date and receipt to be provided to superintendent) and duct work replace all filters as needed. 12. Supply and install all new vents/registers. Electrical: 1. Electrical work is to follow NEC 2023 code as required by state law and local jurisdiction regulations. 2. Supply and install new (Tamper resistant) 50 Switches / Receptacles. 3. Replace and install new weather resistant exterior GFCI & box(es). 4. Install new light fixture in Livingroom ceiling as needed (no wire-mold) 5. Supply and install all new LED (15) Light Fixtures (including exteriors) (8) Combo CO/Smoke Detectors.
Bid Results
Multi-Residential
$17,800.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 25, 2026
March 27, 2026
1122 N Stricker St, Baltimore, MD
Related To This Project
Baltimore, MD
Bid Date: Feb 27 2026
Baltimore, MD
Bid Date: Apr 22 2026
Baltimore, MD
Bid Date: Mar 03 2026
Baltimore, MD
--
Baltimore, MD
Bid Date: Mar 06 2026
Baltimore, MD
--
Baltimore, MD
Bid Date: Mar 03 2026
Baltimore, MD
Bid Date: Feb 25 2026
Baltimore, MD
Bid Date: Feb 18 2028
Baltimore, MD
Bid Date: Mar 02 2026
Baltimore, MD
Bid Date: Mar 27 2026
Baltimore, MD
Bid Date: Feb 25 2026
Baltimore, MD
Bid Date: Mar 12 2026
Baltimore, MD
Bid Date: Mar 02 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.