BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 13, 2026 at 8:00 PM

Updated March 14, 2026

Addition to an educational facility in Moscow Mills, Missouri. Completed plans call for the addition of a 14,963-square-foot educational facility.

A. The Contractor shall coordinate the work, including the work of all subcontractors for the project. B. The Contractor shall schedule and conduct progress meetings. C. Note that the existing building on this site must remain in operation during construction and EVERY PRECAUTION MUST BE TAKEN TO PREVENT INTERRUPTION OF SERVICES. D. All work which requires the interruption of existing utility services, to the existing building(s), shall be performed at times when the buildings are not in use by the Owner, and when the Contractor has received the prior approval of the Architect. E. The Contractor is responsible for all overtime, weekend, or other premium time required to complete this project. F. No trade items (i.e.: piping, ductwork, conduit, etc.) are to be installed below the HVAC Equipment. This will allow for maintenance and replacement of the HVAC Equipment in the future. G. All fire alarms, circuits, etc., shall be properly labeled with the appropriate room number. All Electrical panels to include a plastic laminate I.D. applied sign. H. Prior to start of field work, the Owner's Representative shall hold a pre-construction conference at the site in a location to be designated, in order to discuss coordination, procedures, routing of delivery trucks, location of storage areas, requirements for Contractor's parking of vehicles, barricades, security and scheduling. The Contractor shall inform the Owner of both the starting and completion dates of the site work prior to beginning any particular phase of work at the site. Question Deadline 03/03/2026 at 5:00 PM CT Requests For Substitutions Of Materials Must Be Made In Writing. Requests Submitted After That Date Will Not Be Considered. Estimated Budget $22M Sealed bids will be received for the Troy Buchanan South High School (Ninth Grade Center) Expansion. Drawings and specifications for this project are available at the office of the Architect. Information regarding bidding instructions and requirements for procuring bidding documents may be obtained from the Architect. Not less than the prevailing hourly wage rates determined by the State of Missouri, Division of Labor Standards, shall be paid to all workers employed on this project. The Board of Education intends to award a contract to the lowest responsible bidder complying with the terms of the letting, but reserves the right to reject any or all bids, to reject any part of a bid, to accept any bid deemed to be in its best interest, to advertise for and solicit new bids, and to waive any informalities or technicalities in the bid requirements and specifications.

Bid Results

Educational

$13,059,000.00

Public - County

Addition

177

30

83

6

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
1
Bidding Soon
1,090
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2026

May 11, 2026

Project location map

80 Elm Tree Rd, Moscow Mills, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.