BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 14, 2026 at 8:00 PM

Updated August 16, 2026

Renovation of an educational facility in Huntsville, Texas. Completed plans call for the renovation of a educational facility.

Life Science Building Civil Repairs The Contractor shall provide all materials, equipment, labor, and coordination required to complete the scope of work as generally described below, and as further detailed in the Drawings, Specifications and Exhibit B. It includes but is not limited to: - The contract documents as prepared by Gessner Engineering, titled Life Science Building - Civil Repairs, dated 11/21/2025. o The 2022 Uniform General Conditions. o The Texas State University Systems Division 1 Specifications . o SHSU A&E Guidelines: https://www.shsu.edu/dept/facilities- management/aeguidelines/index.html The scope of this project includes the replacement of sidewalks, new concrete cheek wall, new area inlet, new storm sewer, and new area inlet. o Spoils to be hauled off site by contractor, to another location on campus. oPlease be advised that SHSU will hire a testing firm to provide materials inspecting and testing services, for rebar placement, concrete testing, and soil compaction. Contractor responsible for providing a three-foot tall orange roll out fencing around entire project, to secure it nightly. Contractor on-campus parking needs will be coordinated with SHSU. Contractor is responsible for verifying all field measurements and locating all existing utilities prior to commencement of construction. Contractor to notify owner's designated representative if utilities are found that were not marked. Contractor to submit all trenching, excavation, and back-fill specifications for the work that they will be providing. Contractor shall provide all necessary equipment and conduct all testing for the installed piping. SHSU shall coordinate any needed shutdowns to minimize any impact on campus. Sidewalk and utility shutdowns require a 10-day notice. Notice to Proceed with procurement of material 09/30/2026 Onsite construction to start 11/02/2026 Final Completion 03/04/2027 Question Deadline 08/18/2026 at 12:00 PM CT Respondents shall restrict all contact with the Owner and direct all questions regarding this RFP, including questions regarding terms and conditions, in writing, to the Point-of-Contact person, via email only. Jennifer Niemiec Administrative Coordinator, Facilities Planning and Construction Sam Houston State University Facilities Planning & Construction 2424 Sam Houston Ave. Huntsville, TX 77341 jjn014@shsu.edu The Owner reserves the right to consider any Proposal non-responsive if the Base Proposal Cost is determined to be unreasonable or irresponsible in relation to the other submitted Proposals and/or the Owner's estimate of the construction cost. The University's VetHUB goals are as follows: Building Construction 21.10%

Sub-Bidding

Educational

$500,000.00

Public - State/Provincial

Renovation

1

12

20

3

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
394
Active Projects
205
Bidding Soon
3,367
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2026

November 2, 2026

Project location map

2424 S Sam Houston Ave, Huntsville, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.