BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 18, 2026 at 7:00 PM

Updated February 19, 2026

Site work and paving for a civil project in Stillwater, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Requests for Bids are being solicited for grading, bituminous surfacing, ADA improvements, and drainage for the CSAH 5 (Olive Street) from Deer Path to Owen Street improvement project in Stillwater, MN. CSAH 5 (Olive Street) from Deer Path to Owen Street Grading, Bituminous Surfacing, ADA Improvements, and Drainage Major Quantities Include: Item Unit Quantity Remove Sewer Pipe (Storm) Lin Ft 2844 Remove Curb and Gutter Lin Ft 5179 Remove Bituminous Pavement Sq Yd 12881 Excavation - Common Cu Yd 5122 Select Granular Embankment (CV) Cu Yd 9097 Aggregate Base (CV) Class 5 Cu Yd 2423 Type SP 12.5 Course Mix Tons 3969 RC Pipe Des 3006 (15-30") Lin Ft 2736 Storm Sewer Connection Each 20 Casting Assembly Each 46 Const Drainage Structure Lin Ft 164 4" Concrete Walk Sq Ft 9712 Concrete Curb and Gutter Lin Ft 6174 The Board of County Commissioners of Washington County reserves the right to reject all bids and waive any defects therein. Bids must be accompanied by a bid bond or a corporate surety bond made in favor of Washington County in an amount equal to not less than 5% of the total bid.

GC Bidding

Roads / Highways

$2,000,000.00

Public - County

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
322
Active Projects
203
Bidding Soon
1,663
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2026

May 18, 2026

Project location map

Olive St W, Stillwater, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.