Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 18, 2026 at 7:00 PM
Updated February 19, 2026
Site work and paving for a civil project in Stillwater, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
Requests for Bids are being solicited for grading, bituminous surfacing, ADA improvements, and drainage for the CSAH 5 (Olive Street) from Deer Path to Owen Street improvement project in Stillwater, MN. CSAH 5 (Olive Street) from Deer Path to Owen Street Grading, Bituminous Surfacing, ADA Improvements, and Drainage Major Quantities Include: Item Unit Quantity Remove Sewer Pipe (Storm) Lin Ft 2844 Remove Curb and Gutter Lin Ft 5179 Remove Bituminous Pavement Sq Yd 12881 Excavation - Common Cu Yd 5122 Select Granular Embankment (CV) Cu Yd 9097 Aggregate Base (CV) Class 5 Cu Yd 2423 Type SP 12.5 Course Mix Tons 3969 RC Pipe Des 3006 (15-30") Lin Ft 2736 Storm Sewer Connection Each 20 Casting Assembly Each 46 Const Drainage Structure Lin Ft 164 4" Concrete Walk Sq Ft 9712 Concrete Curb and Gutter Lin Ft 6174 The Board of County Commissioners of Washington County reserves the right to reject all bids and waive any defects therein. Bids must be accompanied by a bid bond or a corporate surety bond made in favor of Washington County in an amount equal to not less than 5% of the total bid.
GC Bidding
Roads / Highways
$2,000,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 17, 2026
May 18, 2026
Olive St W, Stillwater, MN
Related To This Project
Stillwater, MN
--
Stillwater, MN
--
Stillwater, MN
Bid Date: Feb 26 2026
Stillwater, MN
Bid Date: Feb 19 2026
Stillwater, MN
Bid Date: Mar 03 2026
Stillwater, MN
Bid Date: Feb 05 2026
Stillwater, MN
Bid Date: Feb 05 2026
Stillwater, MN
Bid Date: Feb 12 2026
Stillwater, MN
--
Stillwater, MN
Bid Date: Jan 20 2026
Stillwater, MN
Bid Date: Jan 16 2026
Stillwater, MN
Bid Date: Feb 10 2026
Stillwater, MN
Bid Date: Jan 09 2026
Stillwater, MN
--
Stillwater, MN
Bid Date: Nov 14 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
