Published April 17, 2026 at 8:00 PM
Updated May 21, 2026
Site work for a playground / park / athletic field in Newbury, Vermont. Completed plans call for site work for a playground / park / athletic field.
Construction of a 2,223-foot all-persons' accessible trail including boardwalks, a viewing platform, and two accessible parking spaces, all conforming to US Forest Service Trail Accessibility Guidelines. The project includes 2,150 feet of trail tread that is 5.25 feet wide and 6 inches deep, built over 4 oz. non-woven geotextile. Approximately 80 feet of elevated trail will be constructed as a pipe & pile black locust boardwalk with curbing, and there will be an 8-foot by 8-foot pipe pile supported black locust brook viewing platform with curbing. o 1,995 feet of trail tread will be a 5.25 foot wide tread and 151 feet of 4.25 foot wide tread using 3/8 to 1/2 inch minus crush rock (surfacing depth 6-inch) compacted over 4 oz. non-woven geotextile. o 32 feet of elevated trail will be 3-foot wide pipe pile black locust boardwalk with curbing and 45 feet of 5 foot wide pipe pile black locust boardwalk with curbing (connection to bridge built by others). o 8 foot x 8 foot pipe pile supported black locust brook viewing platform with curbing. o Two accessible parking spaces. Construction must be completed no later than October 31, 2026. Pending wetlands permit and archaeological testing. Questions and RSVP to tuckertownforest@gmail.com or call 802-505-5279. The ground will be excavated to accommodate a tread 5.25 foot - 4.25 foot (as specified in the trail plan) wide by 6 inches with minimal environmental impact. Some hole filling and tread grade adjustments will require crushed stone below 4-ounce non-woven geotextile. Tread preparation Excavate to 6-inch depth. Smooth mineral soil on tread, flatten/compact any stone in tread, and apply 4 oz. non-woven Geotextile. Surfacing application Installation of 3- 4 inches of surfacing evenly across the specified width of the trail tread and compact. Install second layer of 3-4 inches of surfacing and compact. Ensure that the tread has an out slope of 3 to 5 percent (this works out to be a 1.8 inch to 3-inch drop in 5 feet). Applied surfacing must be compacted using an 8x8 hand tamper or vibratory plate compactor. Apply cribbing stones where needed. At four points along the trail, bump-outs will be necessary for later installation of benches (to be built by others). Final covering of exposed soil with on-site material such as leaf litter and excess duff. Boardwalks and Platform Pipe and pile construction of 3' X 32 linear feet black locust boardwalk. Pipe and pile construction of 3' X 45 linear feet of black locust boardwalk. Pipe and pile construction of 8' x 8' viewing platform with curbing.
Award
Playgrounds / Parks / Athletic Fields
$68,188.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 20, 2026
July 1, 2026
Tucker Mountain Rd, Newbury, VT
Related To This Project
Newbury, VT
Bid Date: Feb 11 2026
Newbury, VT
Bid Date: Dec 19 2025
Newbury, VT
Bid Date: Mar 21 2025
Newbury, VT
Bid Date: Jan 17 2025
Newbury, VT
--
Newbury, VT
--
Newbury, VT
Bid Date: Jan 08 2021
Newbury, VT
Bid Date: Mar 21 2025
Jamaica, VT
Bid Date: Mar 12 2026
Essex Junction, VT
Bid Date: Mar 12 2026
Montpelier, VT
Bid Date: Feb 18 2026
Middlebury, VT
Bid Date: Feb 18 2026
Burlington, VT
Bid Date: Feb 26 2026
Castleton, VT
Bid Date: Mar 05 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.