BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 17, 2026 at 7:00 PM

Updated February 18, 2026

Site work and paving for a civil project in Aitkin, Minnesota. Completed plans call for site work for a bridge / tunnel; and for paving for a road / highway.

Grading and Aggregate Base on 270th Street/Lane from State Highway 47 to the Sugar Lake Public Access. Approximate major items of work include: Common Embankment (CV) (P), 7,880 CY; Excavation – Common (P), 10,120 CY; Aggregate Base (CV) Class 5, 6,779 CY; 15” CS Pipe Culvert, 688 LF; 18” RC Pipe Culvert Design 3006 Class III, 104 LF; 22” Span RC Pipe-Arch Culvert Class IIIA, 96 LF; and Seeding (P), 10.9 acres. Proposals must be on forms furnished by the County Highway Engineer, sealed, identified on the envelope, and accompanied by a bid bond or certified check payable to the Aitkin County Treasurer in an amount equal to at least five percent of the total amount bid. The county reserves the right to reject any or all bids and to waive any irregularities or defects thereof.

Post-Bid

Roads / Highways

$500,000.00

Public - County

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
37
Bidding Soon
399
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

April 3, 2026

Project location map

To be determined, Aitkin, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.