Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 1, 2026 at 8:00 PM
Updated April 2, 2026
Site work and new construction of a multi-residential development in Toronto, Ontario. Completed plans call civil work for a multi-residential development.
The Project consists of major upgrades to thirteen two-storey townhouse blocks comprising 73 rental units. Inclusion of the additional three-storey walk-up buildings at 27 and 49 Scarlettwood Court will be subject to funding. The project supports key goals outlined in the Project Base Program, including improving indoor comfort and air quality, reducing energy use intensity and emissions within budget achieving deep energy savings of at least 80% and GHG reduction by 90%. It also aims to meet or exceed ASHRAE 62.1 indoor environmental quality standards, reduce air leakage below 1.0 L/s/m² @ 75 Pa, and extend the service life of existing building components through strategic capital renewal. These outcomes will be achieved through comprehensive upgrades to the building envelope—including high-performance walls and roofs using prefabricated or in-situ construction (to be determined), full replacement of windows and patio doors, over cladding of existing façades, re-roofing, and foundation wall waterproofing. Mechanical and electrical improvements will explore the use of air source heat pumps and energy recovery ventilation, lighting upgrades; lighting upgrades to LED; implementation of a Niagara 4-compatible Building Automation System (BAS) [for the walk up apartments only]; improved ventilation with continuous exhaust and dehumidification; smart electrical metering and emergency power provisions; and integration of durable, low-maintenance systems with conversion to full electrification to support the City of Toronto’s TransformTO Net Zero strategy. The existing IPD Team consisting of Toronto Community Housing, The Atmospheric Fund, Enska, Baird Sampson Neuert Architects and Chandos Construction Ltd are seeking the following to join the IPD team: Mechanical Consultant Electrical Consultant Mechanical Contractor Electrical Contractor Each consultant and trade discipline may be awarded as an individual contract. Should a proponent win more than one category, those services may be bundled under the same contract. An NDA will need to be reviewed and signed prior to release of information, please contact Raj Bheda at rbheda@chandos.com with the subject line "TCHC Scarlettwood Complex Deep Retrofit Mechanical & Electrical RFP" noting in the email which package(s) you are interested in, to receive the NDA." Documents are available at https://torontohousing.bonfirehub.ca/ * The project value listed reflects the total project estimate.
Post-Bid
Multi-Residential
$30,000,000.00
Public - City
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 25, 2026
February 25, 2027
Multiple Locations, Toronto, ON
Related To This Project
Toronto, ON
Bid Date: Mar 16 2026
Toronto, ON
Bid Date: Feb 26 2026
Toronto, ON
Bid Date: Mar 16 2026
Toronto, ON
Bid Date: Mar 18 2026
Toronto, ON
Bid Date: Mar 16 2026
Toronto, ON
Bid Date: Mar 06 2026
Toronto, ON
Bid Date: Mar 05 2026
Toronto, ON
Bid Date: Feb 18 2026
Toronto, ON
Bid Date: Mar 04 2026
Toronto, ON
Bid Date: Mar 04 2026
Toronto, ON
Bid Date: Sep 18 2026
Toronto, ON
Bid Date: Mar 18 2026
Toronto, ON
Bid Date: Mar 16 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
