BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 8, 2026 at 7:00 PM

Updated March 9, 2026

Renovation of an educational facility in Sturgeon County, Alberta. Conceptual plans call for the renovation of a educational facility.

Development of the new Pembina Athletic Performance Centre at Sturgeon Composite High School. The facility is anticipated to include purpose-built spaces such as team rooms for home and visiting teams, strength and conditioning areas, sports medicine and treatment spaces, locker and shower facilities, and dedicated areas for coaching, analysis, and instructional use. Question Deadline 03/03/2026 at 2:00 PM MT TIMELINE: Request for Proposals from architect/engineering design consultants is underway. Construction is planned for June 2027 - Spring 2028. Further update pending award of contract. *Construction cost to be confirmed.

Conceptual

Educational

$1,500,000.00

Public - State/Provincial

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
45
Bidding Soon
564
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 29, 2027

Project location map

24400 AB-37, Sturgeon County, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.