BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 19, 2026 at 7:00 PM

Updated February 20, 2026

Renovation of an educational facility in Anton, Texas. Completed plans call for the renovation of a educational facility.

The Project consists of the Work on the Anton School Campus located at 100 Ellwood Blvd. Anton Texas. 1. The Work shall include, but is not limited to, the removal of the existing roof system and the installation of a new roof system as illustrated in the Contract Documents. Work shall also include the removal and replacement of existing rooftop HVAC units as illustrated in the Contract Documents., including all associated curbs, flashing, and reconnection of mechanical and electrical systems, as required for a complete and operational installation 2. All permits necessary for the completion of the Work. Permits shall include, but are not limited to, all Federal EPA, State of Texas Commission of Environmental Quality and Storm Water Pollution Prevention Plan notices and permits plus City of Anton permits. 3. The Contractor shall provide a Storm Water Pollution Protection Plan (SWPP). 4. Procure all required and necessary City of Anton and State of Texas Certifications needed for the Owner's occupancy of the Project. 5. Provide appropriate "Background Checks" on any and all persons involved in the construction activities in a form acceptable to the Owner. The Project consists of the Work on the Anton School Campus located at 100 Ellwood Blvd. Anton Texas. 1. The Work consists of renovation and selective demolition within portions of the existing Middle School / High School facility as indicated in the Contract Documents, including the renovation of the existing Primary Girls' and Boys' Restrooms, renovation of the existing Band Hall and adjacent Locker Room into and supporting new music program space, and renovation of the existing Career and Technical Education (CTE) areas. The Work shall include all selective demolition; architectural, structural, mechanical, electrical, and plumbing modifications; and all related improvements necessary to provide complete, code-compliant, and fully operational spaces in accordance with the Contract Documents. The Contractor shall coordinate all work within the existing, occupied campus and shall maintain safe access, protection of adjacent areas, and continuity of school operations throughout the duration of construction. All permits necessary for the completion of the Work. Permits shall include, but are not limited to, all Federal EPA, State of Texas Commission of Environmental Quality and Storm Water Pollution Prevention Plan notices and permits plus City of Anton permits. 2. The Contractor shall provide a Storm Water Pollution Protection Plan (SWPP). 3. Procure all required and necessary City of Anton and State of Texas Certifications needed for the Owner's occupancy of the Project. 4. Provide appropriate "Background Checks" on any and all persons involved in the construction activities in a form acceptable to the Owner. For Questions and Clarifications, Please Contact Josh Morrison joshua.morrison@gallaghertx.com

Sub-Bidding

Educational

$8,000,000.00

Public - City

Renovation

63

35

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
30
Bidding Soon
231
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2026

May 1, 2026

Project location map

100 E Ellwood Blvd, Anton, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.