BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 17, 2026 at 8:00 PM

Updated March 23, 2026

Site work for a water / sewer project in Clearwater, Florida. Completed plans call for site work for a water / sewer project.

Contractor shall provide all labor, trades, equipment, components, materials, tools, and supervision necessary to replace a non-functioning fire hydrant and install a new American Darling 5-14" Fire Hydrant at USCG Air Station Clearwater. Work includes conducting a site visit and utility verification, coordinating with USCG Facility Engineering for access and safety requirements, performing utility locates, submitting product data for approval, and identifying potential interferences and job hazards. Demolition work involves identifying main water supply control and isolation valves, isolating and depressurizing the water main, excavating around the hydrant assembly, removing the existing hydrant and associated parts, and disposing of materials in accordance with regulations. Installation work consists of installing the new fire hydrant, gravel bed if required, ensuring proper burial depth, and orienting the hydrant per local and city codes. Testing requirements include flushing the service line, pressure testing per AWWA C600, flow testing the hydrant to verify leak free operation, proper drainage, adequate flow and residual pressure, and demonstrating operation to USCG Facilities. Site restoration includes backfilling excavation, restoring pavement, concrete, and landscaping to original condition or better, applying corrosion protection to exposed metal hardware as required, and painting the hydrant red. The contractor is responsible for the removal of all trash and debris from the project area off site upon completion. All work must be approved by the Contracting Officer's Representative. The government will furnish the fire hydrant, traffic flange, gate valve, and associated gaskets. Contractors shall provide all other materials, labor, equipment, permits, supervision, and quality control. The contractor shall warrant that all workmanship is free from defects for a period of one year from the date of substantial completion. Bidders are highly encouraged to inspect the site, coordinate any required access, minimize interference with facility operations, and follow all safety, security, and regulatory requirements. Proposals must include a technical approach, detailed price proposal, and past performance references. United States Coast Guard Air Station Clearwater is accepting proposals for qualified individuals or firms to replace one fire hydrant at Air Station Clearwater. Prior to submitting a quote, it is mandatory to examine the scope of work and it's highly recommended to visit the facility to take field measurements, evaluations, etc. and become familiar with existing conditions under which the work will be performed. After the award of contract, a pre-conference will be held prior to starting the work at Coast Guard Air Station Clearwater. Location- Air Station Clearwater 15100 Rescue Way Clearwater, FL 33762 For contracts over $150,000, performance and payment bonds are required Site Visit Note- workplace and verify all work necessary to complete job. Prospective bidders arrange for a tour of the job site by calling the point of contact, CWO Joe Calderon at 727-423-7586 or via email at Jose.A.Calderon@uscg.mil or DC1 Richard Rendon at (727) 535-1437 x1550 or by email at Richard.L.Rendon@uscg.mil, at least 3 working days in advance. All questions regarding this solicitation must be submitted in writing to CWO Joe Calderon no later than Tuesday Mar 10, 2026.

Post-Bid

Water / Sewer

$13,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
103
Bidding Soon
1,536
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2026

April 13, 2026

Project location map

15100 Rescue Way, Clearwater, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.