Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 24, 2026 at 8:00 PM
Updated May 20, 2026
Demolition, site work and asbestos abatement for a residential development in Greeley, Colorado. Completed plans call for the demolition of a 34,333-square-foot, two-story above grade residential development; for site work for a residential development; and for asbestos abatement for a residential development.
Reference Number 0000413285 Asbestos Abatement & Structural Demolition of 34,333 sqft brick warehouse building constructed in 1908 that suffered a fire in 2025.See included bid documents for full RFP requirements and timeline as well as a detailed demolition plan prepared by competent engineers. While this RFP is all ecnompassing, High Plains is willing to accept a partial bid encompassing either demolition or abatement. High Plains may elect to award demolition and abatement separately. Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required Performance and payment bonds in the amount of 100% of the contract value will be required. March 27: Anticipated Notification of intent to award Question Deadline 03/06/2026 at 11:59 PM MT Questions are submitted online No, Please email questions to: Josh Fulenwider, Director of Real Estate Development at josh@highplainshousingdev.org. Responses will be sent by the question deadline indicated above. A detailed scope of work can be found in Attachment A: Demolition & Abatement Plan. If there is conflict between the below scope and Attachment A, Attachment A will govern. The selected contractor shall provide turnkey abatement and demolition services, including but not limited to the following: 1. Hazardous Materials Abatement o Perform all required abatement activities, including asbestos-containing materials and any other regulated hazardous materials identified in project documentation or encountered during the work. o Comply with all applicable OSHA, EPA, CDPHE, and local regulatory requirements. o Obtain and coordinate all required permits, notifications, inspections, and clearances. 2. Demolition o Complete full demolition of all structures identified in the Demolition Plan. o Remove foundations, slabs, and below-grade structures as specified. o Manage loading, hauling, and lawful disposal of all demolition debris. o Maintain site safety, dust control, erosion control, and environmental protections throughout the work. 3. Utilities o Coordinate, disconnect, cap, and secure all utilities serving the structures, including gas, electric, water, sewer, and telecommunications. o All utility coordination and associated costs shall be the responsibility of the contractor. 4. Salvage and Recycling o Salvage of materials is permitted o If salvage is conducted, the contractor shall provide a credit to High Plains Housing Development Corp. for the salvage value of materials retained or sold by the contractor. o The proposal shall clearly describe the salvage approach and how salvage credits will be calculated and applied. 5. Schedule o The contractor shall propose a target start date and duration for the work. o Work shall be sequenced to minimize disruption to adjacent properties and ongoing activities on the campus. *** In the event that any requirements of the RFP conflict with the final contract, the contract shall govern.
Post-Bid
Residential Subdivision
$300,000.00
Public - County
Asbestos Abatement, Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
