BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 24, 2026 at 8:00 PM

Updated March 25, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Canton, New York. Completed plans call for the demolition of a bridge / tunnel; and bridge / tunnel.

**As of March 24, 2026, this project has not yet been awarded. A timeline for the award has not yet been established.** The work includes providing all labor, materials, machinery, tools, equipment, and other means of construction necessary and incidental to the completion of the work shown on the plans and described in the specifications. The scope includes, but is not limited to, the following: Replacement of County Route 22 over Sawyer Creek including the removal and replacement of the bridge on a similar vertical and horizontal roadway alignment, installation of a 72-6 long multiple steel girder superstructure with composite concrete deck, support on semi-integral abutments bearing on bedrock, 10-0 travel lanes, 4-0 shoulders, about 400 feet of approach roadway reconstruction, and new box beam guide railings. Traffic will be maintained on an off-site detour during construction. Replacement of County Route 34 over Trout Brookincluding removal and replacement of the existing bridge on a similar alignment, installation of a 60-0 long multiple steel girder superstructure with composite concrete deck, support on integral abutments on drilled micropiles to bedrock, 10-0 travel lanes, 4-0 shoulders, about 150 feet of approach roadway reconstruction, and new box beam guide railings. Traffic will be maintained on an off-site detour during construction. This is a Federal Aid Project and NYSDOT Standard Specifications must be followed. There are specified EEO Employment goals. All bids must include the required forms and a bid security of at least 5%. The successful bidder will be required to furnish Performance, Payment, and Guarantee Bonds for an amount not less than 100% of the accepted bid. The successful bidder and all subcontractors must have an approved CCA-2 on file with NYSDOT prior to contract award. The project is covered under New York State Labor Law, and each bidder must hold a valid Certificate of Registration from NYSDOL. The project owner reserves the right to consider bids for forty-five days after receipt before awarding any contract and may reject any or all bids. No questions regarding the bid will be accepted within seven business days prior to bid opening. Bids must be received in a sealed envelope and must include all required documentation as specified in the instructions. CONTRACT NO. 1 BIN 3340950,3341630 Question Deadline 03/10/2026 Questions regarding the Contract Documents should be directed Bids@stlawco.gov within 7 days of bid opening.

Bid Results

Bridges / Tunnels

$3,225,000.00

Public - County

Demolition, New Construction, Paving, Site Work

90

6

8

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
5
Bidding Soon
989
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2026

May 18, 2026

Project location map

Multiple Locations, Canton, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.