BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 12, 2026 at 8:00 PM

Updated March 13, 2026

Site work and paving for a road / highway in Madison, Illinois. Completed plans call for site work for a road / highway.

The scope of work consists of the construction of ADA curb ramps, removal and replacement of inlets, and HMA resurfacing of 10th St. Bids must be for the contract as a whole. Contractors are required to pay prevailing wage rates as determined by the Department of Labor and comply with the Davis-Bacon Act. The project is subject to approval of permits and availability of funds from Madison County Community Development and is subject to all related regulations and requirements. Section 3 Participation and Build America, Buy America Act compliance are required. All iron, steel, manufactured products, and construction materials used must be produced in the United States unless a waiver is obtained, and material certifications must be provided. Compliance with the Contract Work Hours and Safety Standards Act is required, including overtime pay and adherence to safety standards and recordkeeping. All applicable laws, ordinances, and rules and regulations of authorities with jurisdiction apply to the contract.

Post-Bid

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
82
Bidding Soon
1,184
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2026

April 12, 2026

Project location map

10th Street, Madison, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.