Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 13, 2026 at 8:00 PM
Updated March 25, 2026
Site work and paving for a sidewalk / parking lot in Atlanta, Georgia. Working plans call for site work for a sidewalk / parking lot.
The City of Atlanta, on behalf of the Atlanta Department of Transportation, will undergo a Multi-Step Sealed Bid process consisting of a prequalification phase followed by an Invitation for Bid (IFB) for the procurement of construction services to deliver pedestrian mobility enhancements along Cleveland Ave. The selected contractor will be responsible for furnishing all labor, materials, equipment, and supervision necessary to construct pedestrian mobility improvements along Cleveland Avenue. Pre-qualification requirements: Vendors will be evaluated during the prequalification phase to determine whether they meet the minimum requirements, including demonstrated experience in construction adhering to GDOT Specification, ADA Regulations, traffic safety and utility coordination. Scope of work - The scope of work for this project consists of roadway and pedestrian improvements along Cleveland Avenue. The length of the project is 1.42 miles. All improvements shall be constructed according to the construction plans for each location and by all GDOT standards and specifications. The purpose of the Cleveland Avenue Pedestrian Mobility Improvement project is to install pedestrian signal upgrades, ADA-compliant ramps, new pedestrian hybrid beacons (PHBs) and rectangular rapid flashing beacons (RRFBs) at unsignalized intersections and mid-block crossings, pedestrian refuge islands, include new and/or replace crosswalks, speed detection and notification signs, minor intersection geometry changes to enhance pedestrian crossings, new sidewalks, and new landscaping.
Final Planning
Sidewalks / Parking Lot
$5,000,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 27, 2026
May 26, 2026
Cleveland Ave, Atlanta, GA
Related To This Project
Atlanta, GA
Bid Date: Feb 23 2026
Atlanta, GA
Bid Date: Feb 20 2026
Atlanta, GA
Bid Date: Mar 24 2026
Atlanta, GA
Bid Date: Mar 04 2026
Atlanta, GA
Bid Date: Mar 06 2026
Atlanta, GA
--
Atlanta, GA
Bid Date: Feb 26 2026
Atlanta, GA
--
Atlanta, GA
Bid Date: Mar 03 2026
Atlanta, GA
--
Atlanta, GA
Bid Date: Apr 02 2026
Atlanta, GA
Bid Date: Feb 27 2026
Atlanta, GA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
