BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 20, 2026

Site work and new construction of a civil project in Holtville, California. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Construct a new water treatment system including a new wood-framed building to house filters, chlorine storage and feed system, booster pump system with hydropneumatic tank, and all electrical, mechanical, instrumentation, programming, testing and start-up for a complete and functional facility. A new water feed and backflow will be installed for filling the firewater tank. No other work is proposed to the fire tank. The existing fire pump will be disconnected from the existing power sources and generator. A new utility service to the main switchboard and new fire pump switchboard will be provided. The fire pump will have a new automatic transfer switch connected to the existing generator and new fire pump switchboard to serve the fire pump distribution panel at HEBER DUNES SVRA in Imperial County, California. Question Deadline 03/19/2026 at 2:00 PM PT Questions and Answers: Any discrepancies, omissions, ambiguities, or conflicts in or among the contract documents or doubts as to meaning shall be brought to the State's attention by emailing your questions to Merrilee.Byrnes@parks.ca.gov seven (7) calendar days prior to bid opening date. Answers will be provided by Addendum on this website, and it is the responsibility of the bidders to download any addendum as needed. Participation in Disabled Veteran Business Enterprise Program (DVBE): The minimum DVBE participation percentage goal is 6%. Failure to fulfill the DVBE requirement will render your bid non-responsive. DVBE Incentive: For evaluation purposes only, an incentive will be given to bidders who exceed the 6% DVBE participation requirements. Refer to the DVBE forms beginning with DPR 479IP. Small Business Preference and Small Business Subcontractor Participation: A five percent (5%) Small Business Preference will be granted to properly certified small businesses (a completed STD 811 Form must be submitted with the bid proposal).

Post-Bid

Water / Sewer

$3,000,000.00

Public - State/Provincial

New Construction, Site Work

43

22

14

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
27
Bidding Soon
296
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2026

May 25, 2026

Project location map

1610 Heber Rd, Holtville, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.