BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 21, 2026 at 8:00 PM

Updated May 21, 2026

Site work and new construction of a water / sewer project in Jacksonville, Florida. Working plans call for the construction of a water / sewer project.

“The owner has determined a prequalified list of construction managers. A timeline for construction has not yet been established.” https://www.jaxdailyrecord.com/news/2026/mar/27/development-today-bb-hotel-windsor-inn-near-jia-expands-renovations/ JEA Arlington East Waste Water Treatment Plant, 1555 Millcoe Road, contractor is Wharton-Smith Inc., new concrete slab, pumps, piping and filtration system, $121,500. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ The purpose is to evaluate and select a vendor to provide pre-construction services (including early works activities) and construction of a new Arlington East Water Purification Facility (WPF) designed to treat an influent average flow of eight (8) million gallons per day (MGD) and 6.4 MGD of production. The new WPF will be located adjacent to the existing Arlington East Water Reclamation Facility at 1555 Millcoe Road, Jacksonville, Florida 32225 and will consist of the following purification processes: Membrane Filtration (MF), Reverse Osmosis (RO), Ultraviolet (UV) light advanced oxidation process (AOP), Membrane degasification, and Post purification stabilization. Coordination efforts with the Owner and program support team will be necessary. Note that active construction may be ongoing at the WPF site or at adjacent site locations for associated projects or related improvement projects. Bids are to only be submitted electronically via the Zycus platform. Solicitation documents may be downloaded from the JEA website. Please contact Marline McDonald, mcdomv@jea.com. MANDATORY Pre-Response Meeting Location: via Microsoft Teams or Teleconference email Marline McDonald at mcdomv@jea.com for meeting link. Those planning to attend the Mandatory PreResponse Meetings should send contact information to: mcdomv@jea.com, 48 hours prior to the Pre-Response Meetings to have contact information documented. Question Deadline 03/10/2026 All Questions must be submitted in writing to the JEA Buyer listed herein at least five business days prior to the opening date. Questions received within five business days prior to the opening date may not be answered

Final Planning

Water / Sewer

$50,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
69
Bidding Soon
1,087
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2026

November 17, 2026

Project location map

1555 Millcoe Rd, Jacksonville, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.