Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 20, 2026 at 7:00 PM
Updated February 21, 2026
Site work and new construction of a bridge / tunnel in Faribault, Minnesota. Conceptual plans call for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.
The City of Faribault approved plans to replace the existing deteriorated deer pedestrian bridge on the Straight River Trail east of Willow Street and north of Sunset Mobile Home Park. The project includes removing the current railroad timber bridge, installing a new single-span prefabricated steel bridge with concrete decking, and restoring adjacent trail areas. The projected cost is $604,056, with $100,000 funding secured through a DNR Local Trails Connection Grant. Construction is planned for fall 2026, pending fabrication lead time, with possible delay into spring 2027. Informational Coverage: This project receives automated updates from sources only and will not be actively tracked by our Content team. Information is provided as-is for planning awareness. Should you wish to provide information on this project or are seeking an update, please email contentcase@constructconnect.com.
Conceptual
Bridges / Tunnels
$604,056.00
Public - City
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 14, 2026
Willow St, Faribault, MN
Related To This Project
Faribault, MN
Bid Date: Mar 20 2026
Faribault, MN
Bid Date: Feb 27 2026
Faribault, MN
--
Faribault, MN
Bid Date: Feb 05 2026
Faribault, MN
Bid Date: Feb 19 2026
Faribault, MN
Bid Date: Feb 12 2026
Faribault, MN
Bid Date: Feb 05 2026
Faribault, MN
Bid Date: Feb 05 2026
Faribault, MN
--
Faribault, MN
Bid Date: Jan 08 2026
Faribault, MN
Bid Date: Jan 08 2026
Faribault, MN
Bid Date: Jan 08 2026
Faribault, MN
Bid Date: Dec 09 2025
Faribault, MN
--
Faribault, MN
Bid Date: Dec 16 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
