Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 30, 2026 at 8:00 PM
Updated May 21, 2026
Site work for a water / sewer project in Victor, Colorado. Completed plans call for site work for a water / sewer project.
Work to be performed generally includes construction of approximately 14,500 linear feet of a new 12-inch raw water transmission pipeline (HDPE) connecting the Bison Park Reservoir and Victor Reservoir #2 to the City of Victor raw water system. The project includes pipeline installation along rural roadway and off-road corridors, horizontal directional drilling under wetland, open cut across creek crossings, an open cut crossing of County Highway 81, associated isolation valves, air release valves in vaults and appurtenances, an 8-inch meter in CIP vault with bypass (instrumentation and controls by Owner), clearing and grubbing, trenching and backfill, roadway restoration, and coordination with environmental and right-of-way requirements. Work also includes maintaining service continuity during construction, post installation testing, and restoring disturbed areas in accordance with project specifications. Bids shall be made on the forms furnished by the Owner, enclosed in a sealed envelope, and endorsed with the name of the Bidder. The successful Bidder will be required to furnish a Performance Bond and a Labor and Materials Payment Bond in the full amount of the Contract Price. A 5% Bid Bond will be required. The Owner reserves the right to reject any and all Bids, waive any informality, technicality or irregularity in any Bid, disregard non-conforming, non-responsive, conditional or alternate Bids, negotiate contract terms with the successful Bidder, and require statements or evidence of Bidders' qualifications, including financial statements. Question Deadline 03/18/2026: Any questions concerning this bid shall be directed to the project manager, Nathan (Emery) Layton, PE with RESPEC Company, LLC (719) 402-0007, preferably in writing to emery.layton@respec.com.
Bid Results
Water / Sewer
$3,999,856.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 15, 2026
June 15, 2026
To be determined, Victor, CO
Related To This Project
Victor, CO
Bid Date: Oct 02 2025
Victor, CO
Bid Date: Mar 12 2025
Victor, CO
--
Victor, CO
Bid Date: Mar 23 2023
Victor, CO
Bid Date: Jan 28 2022
Grand Junction, CO
--
Denver, CO
Bid Date: Mar 11 2026
Grand Junction, CO
Bid Date: Mar 31 2026
Greeley, CO
Bid Date: Feb 23 2026
Denver, CO
--
Vail, CO
Bid Date: Mar 17 2026
Greenwood Village, CO
Bid Date: Mar 03 2026
Aurora, CO
Bid Date: Mar 10 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
