BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 18, 2026 at 8:00 PM

Updated March 19, 2026

Renovation of an educational facility in Waukon, Iowa. Completed plans call for the renovation of a educational facility.

The project consists of HVAC upgrades at the Allamakee Community School District Middle School. The scope includes providing ductless mini-split heat pump/air conditioning systems, hot water pumps, dedicated outside air units, kitchen air handling units, dining room air handling unit, terminal heating units, control valves, test and balancing, individual room heating and cooling units, ducted air distribution systems, control system upgrades, electrical system upgrades, new ceilings, new lights, incidental fire alarm modifications, incidental plumbing system modifications, incidental painting, flooring, incidental sprinkler protection, walk-in cooler and freezer cooling equipment, new primary electrical transformer, ventilation units for High School and Middle School locker room areas, and replacement windows. Demolition of specified components and removal, off-site storage, and return of movable items to make way for asbestos removal and project construction are also included. Alternate work includes new windows and exterior wall work at East Elementary School, Middle School humidification systems, and the total remodeling of the Middle School Auditorium and Stage systems, and associated architectural component changes. Alternates may include new heating for the East Elementary School stage, new stage curtains for East Elementary School and Middle School Auditorium stages, replacement windows, and replacement flooring materials at East Elementary School. Bid proposals must be submitted on a form provided by the Board of Education and accompanied by a bid security equal to five percent of the base bid and alternates. Bidders must be prepared to submit performance and payment bonds. Out-of-State bidders must submit an Out-of-State Contractor bond to the Iowa Division of Labor. Bids should not include any Iowa State Sales and Use Tax or City of Waukon plan review or permit fees. The contractor must ensure nondiscrimination of employees and applicants. All work must comply with OSHA guidelines and project specifications. Payment will be made based on monthly estimates with final payment subject to specified conditions. Proposed plans, specifications, and contract documents may be obtained from the Design Professional. Attendance at the Pre-Bid Conference and site visits are encouraged but not mandatory.

Post-Bid

Educational

$6,000,000.00

Public - County

Renovation

65

18

96

5

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
53
Bidding Soon
530
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2026

May 11, 2026

Project location map

1059 3rd Ave NW, Waukon, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.