Published March 20, 2026 at 8:00 PM

Updated March 24, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Del Mar, California. Design plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

https://govmarketnews.com/del-mar-rail-trestle-replacement-sandag-double-track-project/ Regional transit planners in California have cleared another financial step toward replacing Del Mar’s 110-year-old wooden train trestle, part of a broader rail upgrade intended to improve reliability and capacity on the coastal corridor linking San Diego with Los Angeles. The effort, dubbed the San Dieguito Double Track and Special Events Platform project, has been cleared for an advance of up to $62 million in local funds to keep the project on track for construction next year. The project is headed by the San Diego Association of Governments (SANDAG) and is estimated to cost around $350 million in total. The SANDAG board approved the advance from local TransNet reserves, with repayment expected over three years beginning in 2029 through the State Transportation Improvement Program. The project has also received a $53.9 million grant from the U.S. Department of Transportation’s (USDOT) Infrastructure for Rebuilding America (INFRA) program, along with $100 million from California’s Transit and Intercity Rail Capital Program and other state and federal sources. The project will replace the aging wooden trestle bridge over the San Dieguito River with a new structure elevated above the 100-year floodplain, designed to reduce operational disruptions from severe storms, king tides and flooding linked to sea level rise. It also includes about 1.5 miles of new double track between the Solana Beach trench and the north end of the Camino del Mar and Jimmy Durante overpass. This stretch currently includes single-track sections that require trains to wait for oncoming traffic before passing, limiting capacity and contributing to service delays. Adding double track through this segment will allow northbound and southbound trains to pass simultaneously, improving reliability and supporting increased service capacity across the corridor. Along with track improvements, a new special events platform at the Del Mar Fairgrounds will provide rail passengers with direct access to events at the fairgrounds such as the San Diego County Fair. The platform is also expected to reduce vehicular traffic and congestion around the fairgrounds during major events. Other planned work includes upgrades to signals and communications systems, new track turnouts, embankment reinforcement, drainage improvements and the relocation of utilities. No new land acquisition is needed, according to officials, as the project scope falls within the existing North County Transit District (NCTD) right-of-way. The project is located along the Los Angeles-San Diego-San Luis Obispo (LOSSAN) Rail Corridor, which carries Amtrak Pacific Surfliner intercity service, NCTD COASTER commuter trains and freight operations through the San Diego region. Environmental review for the project began in late 2015, and the Federal Railroad Administration (FRA) issued a Finding of No Significant Impact in January 2016 under the National Environmental Policy Act (NEPA). Permitting was completed in October 2017 and design progressed to the 90% milestone in January 2020. Final design is now complete, and SANDAG expects to advertise for construction bids in 2026. Construction is expected to begin in early 2027 and be completed by mid-2031. ------------------------------------ This project includes the replacement of the existing bridge on Camino del Mar over the San Dieguito River in accordance with Federal Highway Bridge Program requirements. The current budget will provide funding needed to complete permitting and final design in FY 2025-2026 and advertise for public bidding and begin construction in FY 2026-2027. The project is included in the City's 2026-2035 Capital Improvement Program (CIP) As of February 24, 2026, this project is in the design phase. Bidding is expected for the summer of 2026 with construction expected to start at the beginning of 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. \

Design

Bridges / Tunnels

$67,970,000.00

Public - City

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
1
Bidding Soon
1,251
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2027

Project location map

Camino Del Mar, Del Mar, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.