BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 15, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a mixed-use development in Pittsburgh, Pennsylvania. Completed plans call for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The City of Pittsburgh Office of Management and Budget, on behalf of the Department of Public Works, is soliciting bids from qualified firms for South Side Park improvements Phase 1A Construction. Question Deadline 03/25/2026 at 5:00 PM ET All questions must be submitted via electronically. City of Pittsburgh Participation Goals: 18% MBE 7% WBE 5% VOSB 3% LGBTQ+ The Work for this Project consists of, but is not limited to: 1. General Construction - Base Bid Including, but not limited to: project coordination, permits, bonds, surveying, layout, temporary fencing, removals, erosion and sedimentation control, stake out of improvements, unclassified excavation, earthwork, grading, installation of stormwater tanks, subgrade preparation & compaction, foundations, walls, plumbing - water and sanitary, concrete paving, asphalt paving, nature surface trail, timber bridge, curbs, stone work, chain link fence, handrails, electrical for lighting and other amenities, electrical panel connection, benches, trash receptacles, lighting, signage, line striping, and seeding. All work on the drawings shall be included in the Base Bid unless noted on the drawings as an Alternate. 2. Alternate One Including, but not limited to: Concrete walk between the serpentine steps and South 18th Entrance as shown on sheet SP3. Concrete curb is included in the Base Bid. 3. Alternate Two Including, but not limited to: Bituminous paving (standard duty) in lieu of geoweb in the upper parking lot as shown on sheet SP1. 4. Alternate Three Including, but not limited to: Tree planting as identified on the Planting Plan Drawings. 5. Add Alternate Four Including, but not limited to: Pole foundations, light poles, luminaires, and wire for four (4) City standard light poles as shown on electrical drawings. All work associated with lighting/electrical trench, conduit, junction boxes, and other lighting shall be included in the Base Bid.

Post-Bid

Playgrounds / Parks / Athletic Fields

$5,000,000.00

Public - City

Paving, Site Work

149

40

3

7

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
371
Active Projects
227
Bidding Soon
2,474
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2026

June 1, 2026

Project location map

2005 S 18th St, Pittsburgh, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.