Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 14, 2026 at 8:00 PM
Updated May 20, 2026
Site work for a water / sewer project in Barker, New York. Completed plans call for site work for a water / sewer project.
Every request forsuch interpretation shall be inwriting addressed to Shannon Westoven (swestoven@wendelcompanies.com) and to be given consideration, must be received prior to 4:00 pm on Monday, March 2, 2026. If the Engineer determines that an interpretation is not required, none shall be given. This work consists of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site. Mobilization includes the obtaining of permits, insurance, and bonds as required. This item is included in the Contract Base Bid to cover the cost of additional work which may be requested by the Owner that is beyond the original scope of the Contract documents. This work shall consist of the costs incurred due to the construction of any item not specifically detailed in any other specification and/or plan sheet, but which is necessary to construct the project or is directly related to the operation of the new work and/or adjacent facilities. This item includes but is not limited to all bonds, insurance, mobilization, labor, supervision, tools, equipment, and all other materials not included elsewhere but needed to complete the work contemplated. Work under this item shall be performed on an as needed basis as directed by the Owner and/or Engineer. The base bid work consists of the removal and disposal of the existing lagoon 1 equipment. Removal, dewatering to 20% solids using mechanical drying or other approved methods, chemical addition (PAC), and disposal of sludge from the existing lagoon. Inspection and repair of clay liner in the lagoon as needed to provide a working system. Providing and installing a new lagoon system including all piping, fittings, valves, and equipment startup. The Contractor is responsible for all permitting and testing requirements for proper disposal of all materials. The alternate bid work includes the removal and disposal of the existing lagoon 2 equipment. Removal, dewatering (20% solids), chemical addition (PAC), and disposal of sludge from the existing lagoon. Inspection and repair of clay liner in the lagoon as needed to provide a working system. Providing and installing a new lagoon system including all piping, fittings, valves, and equipment startup.
Award
Water / Sewer
$520,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
