BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 29, 2026 at 8:00 PM

Updated March 30, 2026

Site work for a water / sewer project in Fountain Valley, California. Completed plans call for site work for a water / sewer project.

Construction of AM-21R and AM-63 Monitoring Wells Cluster. The AM-21R well site is located in the City of Anaheim on private property approximately 450 feet south of Katella Avenue and 250 feet west of Dougless Road. The AM-63 well site is located in the western-most parking log of Placentia Champions Sports Complex Contract No.: GBM-2025-1. Question Deadline 03/10/2026 at 12:00 PM PT All questions relative to this project prior to the opening of bids shall be directed, in writing, to OCWD Attention: Ashlie Palamara, Contracts Administrator Telephone: (714) 378-3200 Email : procurement@ocwd.com The Work involves furnishing all labor, materials and equipment, in strict compliance with the Contract Documents, for a completed work of improvement, as follows: The work to be performed and bid complete herein, shall be as shown and specified in the Technical Specifications and on the Plans (Figures) and is generally described as supplying all labor, equipment, materials and forces necessary to complete the construction of four monitoring wells at two sites (2 well clusters) by the direct mud rotary method. The well sites are located in the cities of Anaheim and Placentia (Figures 1 through 4). These monitoring well installations will be conducted under Orange County Water District (OCWD or District) Contract No. GBM-2025-1. The anticipated monitoring well depths will vary from a minimum of 175 feet to a maximum of 555 feet below ground surface (bgs). Geophysical logs shall be completed in the deep borehole for each site prior to well construction. Well depths are approximate and final well depths will be based on site-specific geologic conditions. The general and sitespecific well locations are shown in the Figures. Geologic conditions in the project area are variable with sediments ranging from clay to coarse gravel and possible heaving sands. The wells shall be drilled using the direct mud rotary method or approved equal. Well logs of existing District monitoring wells in the area of the proposed AM-21R well site are available in its Exhibits.

Bid Results

Water / Sewer

$613,623.00

Public - County

Site Work

3

9

3

7

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
0
Bidding Soon
1,947
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2026

April 24, 2026

Project location map

Multiple Locations, Fountain Valley, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.