Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 29, 2026 at 8:00 PM
Updated May 21, 2026
Site work and paving for a civil project in Leaf River, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; bridge / tunnel; and bridge / tunnel.
This project consists of rehabilitating the existing single span (57-9) precast prestressed concrete deck beam bridge. This rehabilitation involves replacing the superstructure supported by spill-thru abutments. In-stream work includes placement of scour protection countermeasures at the existing abutments/wingwall slopes. Roadway improvements include reconstruction of the approach roadway. This Project Consists of Rehabilitating the Existing Single Span (57'-9") Precast Prestressed Concrete Deck Beam Bridge. The Proposed Work Consists of Furnishing and Installing Erosion Control Blanket (97 Sq Yd), Stone Riprap Class A5 (56 Sq Yd), Filter Fabric (56 Sq Yd), Aggregate Base Course Type B (88 Ton), Aggregate Surface Course Type B (78 Ton), Removal of Existing Superstructure (1 Each), Concrete Removal (2.20 Cu Yd), Structure Excavation (30 Cu Yd), Concrete Structures (5.70 Cu Yd), Precast Prestressed Concrete Deck Beams 27-inch Depth (1,576 Sq Ft), Epoxy Coated Reinforcing Bars (910 Pound), Steel Railing Type S1 (121 Foot), Granular Backfill for Structures (17 Cu Yd), Geocomposite Wall Drain (18 Sq Yd), Concrete Headwalls for Pipe Drain (4 Each), Underdrains for Structure Type 4 (70 Foot), Mobilization (1 L Sum), Earth Excavation Special (43 Cu Yd), Seeding Class 2a Special (0.04 Acre), and Traffic Control and Protection Special (1 L Sum), All in Accordance With the Plans and Specifications. Project Location: W. Sumner Rd. Over Otter Creek Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Rehabilitating the Existing Single Span Precast Prestressed Concrete Deck Beam Bridge - W. Sumner Road
Award
Bridges / Tunnels
$345,271.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 6, 2026
April 6, 2026
W Sumner Rd, Leaf River, IL
Related To This Project
Leaf River, IL
Bid Date: Jun 12 2026
Leaf River, IL
--
Leaf River, IL
Bid Date: Mar 06 2026
Leaf River, IL
Bid Date: Jun 13 2025
Leaf River, IL
Bid Date: Mar 08 2019
Leaf River, IL
--
Leaf River, IL
--
Leaf River, IL
Bid Date: Jun 13 2025
Leaf River, IL
Bid Date: Jun 10 2022
Leaf River, IL
Bid Date: Mar 10 2023
Oregon, IL
Bid Date: Mar 06 2026
Oregon, IL
Bid Date: Mar 06 2026
Byron, IL
Bid Date: Mar 06 2026
Flagg, IL
Bid Date: Mar 06 2026
Springfield, IL
Bid Date: Feb 26 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
