BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 25, 2026 at 7:00 PM

Updated February 26, 2026

Site work and paving for a bridge / tunnel in Columbus, Ohio. Conceptual plans call for site work for a bridge / tunnel.

Replace existing slab superstructures on two bridges (TUS-77-2018 L & R) and replace steel beam superstructures on two bridges (TUS-77-2089 L & R) with new steel beam superstructures. Work includes replacing approach slabs on all four structures and repairing abutments. As of February 25, 2026, anticipated letting date July 1, 2041. Informational Coverage: This project receives automated updates from sources only and will not be actively tracked by our Content team. Information is provided as-is for planning awareness. Should you wish to provide information on this project or are seeking an update, please email contentcase@constructconnect.com

Conceptual

Bridges / Tunnels

$12,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
0
Bidding Soon
916
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2036

Project location map

TUS IR 77, Columbus, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.