Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 3, 2026 at 8:00 PM
Updated April 4, 2026
Site work for a water / sewer project in Stoughton, Massachusetts. Completed plans call for site work for a water / sewer project.
Question Deadline 03/12/2026 Every request for such interpretation should be in writing or e-mailed to; Stephen Olson, P.E., H2Olson, Engineering, Inc, 10 Riverside Drive, Suite 103, Lakeville, MA 02347 or Usco@h2olsonengineering.comU to be given consideration must be received at least six (6) calendar days prior to the date fixed for the opening of bids. Replacement of existing CI and steel water mains with new DI water mains on Pearl Street Place, Bay Road, Westwood Road, Talbot Street, Bell Street, Freeman Street, And Campanelli Parkway. The work includes, but is not necessarily limited to, the replacement of approximately 900 feet of 2-inch cast iron pipe on Pearl Place with new 8-inch ductile iron main (from Pearl Street to Cushing Street); replacement of 700 feet of 2-inch and 1.5-inch ductile iron pipe on Bay Road and Westwood Road with new 6-inch ductile iron main (192 Bay Road to the end of Westwood Road); replacement of 580 feet of 4-inch cast iron main on Talbot Street with new 8-inch ductile iron main (Lambert Avenue to Central Street); replacement of 280 feet of 2-inch cast iron pipe on Bell Street with 6-inch ductile iron main; replacement of 650 feet of 6-inch cast iron main on Freeman Street with new 8-inch ductile iron main (from the Fire Station to Hayden Street); and replacement of 2,200 feet of 10-inch ductile iron pipe with 12-inch ductile iron pipe on Campanelli Parkway (Turnpike Street to Shuan Avenue), including all services, valves, hydrants, fittings, and other appurtenances. Construction must be completed within 180 calendar days from the date of the Notice to Proceed, excluding final paving. The Owner reserves the right to waive informality, reject any or all bids, and omit parts of the work as needed to maintain costs within available funds. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.
Post-Bid
Water / Sewer
$2,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 18, 2026
May 18, 2026
Multiple Locations, Stoughton, MA
Related To This Project
Stoughton, MA
Bid Date: Mar 03 2026
Stoughton, MA
Bid Date: Mar 25 2026
Stoughton, MA
Bid Date: Mar 23 2026
Stoughton, MA
--
Stoughton, MA
--
Stoughton, MA
Bid Date: Mar 18 2026
Stoughton, MA
Bid Date: Mar 19 2026
Stoughton, MA
Bid Date: Feb 27 2026
Stoughton, MA
Bid Date: Jan 30 2026
Stoughton, MA
Bid Date: Jan 30 2026
Stoughton, MA
Bid Date: Jan 08 2026
Stoughton, MA
Bid Date: Dec 11 2025
Stoughton, MA
Bid Date: Dec 17 2025
Stoughton, MA
--
Stoughton, MA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
