Site work and new construction of a communication facility in North Fort Myers, Florida. Completed plans call for the construction of a communication facility.

Rebuild 3.76 miles of existing 138kV transmission line from Burnt Store Substation to West Cape Substation. Questions Due 03/11/2026 All questions and request for additional information should be directed to Emmett Orfan by email Emmett.Orfan@lcec.net Substation 1.1 Remove (46) existing concrete structures from Structure 2J003 to West Cape Substation. 1.2 Remove approximately 3.64 miles of 636 ACSR/AW. 1.3 Remove approximately 510ft of 1780ACSR/TW/AW 1.4 Remove approximately 3.74 miles of 7#9 Alumoweld wire. 1.5 Remove all facilities of existing structures marked for removal or replacement. 1.6 Install (38) new TPM-138R2 concrete structures (including flange connections) with direct embedment using crushed rock backfill. 1.7 Install (5) new TSM-138 S5-THETA steel structures with new caisson (drilled shaft) foundations. 1.8 Frame (38) new concrete structures with TM-1P-138L-1158, 138 kV Line Post Insulator Assembly. 1.9 Frame (5) new steel structures with TM-1-138A5-SIL-1158, 138 kV Double Dead-End Assembly. 1.10 Frame (2) existing steel structures (2J001A and 2J002) with TM-1-138A5-SIL-1158, 138 kV Double Dead-End Assembly. 1.11 Frame steel structure 2J001B with TM-1P-138S-1158, 138 kV Line Post Insulator Assembly. 1.12 Install approximately 3.76 miles of AFL DNO 3530 48-count fiber OPGW. 1.13 Install approximately 3.76 miles of 1158 ACSS 25/7 TW "Hudson" (Maximum operating temperature = 392F). 1.14 Install new overhead shield wire (7#9 Alumoweld) (1) from ahead span Burnt Store Substation to 2J001, (2) from ahead span Structure 2J043 to West Cape Substation Bus A, (2) from ahead span Structure 2J043A to West Cape Substation Bus C, and (1) from ahead span of West Cape Substation Bus B to Structure 2J050. 1.15 Install grounding and grounding rods for all new structures. 1.16 Return disturbed sidewalk to previous condition at Structures 2J033 and 2J042 after pole installation. 1.17 Transfer existing distribution conductors and equipment to transmission structures from 2J017 to 2J019. 1.18 Replace (3) existing concrete poles from 2J018 to 2J020 with distribution poles to house distribution service connections. 1.19 Relocate other Sub Surface Utilities or Utilities in conflict at locations as required (refer to SUE report). 1.20 Worksite must be restored exact to its pre-existing condition

Post-Bid

Communication

$10,000,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2026

June 29, 2026

Project location map

To be determined, North Fort Myers, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.