Published March 13, 2026 at 8:00 PM
Updated March 28, 2026
Site work and new construction of a communication facility in North Fort Myers, Florida. Completed plans call for the construction of a communication facility.
Rebuild 3.76 miles of existing 138kV transmission line from Burnt Store Substation to West Cape Substation. Questions Due 03/11/2026 All questions and request for additional information should be directed to Emmett Orfan by email Emmett.Orfan@lcec.net Substation 1.1 Remove (46) existing concrete structures from Structure 2J003 to West Cape Substation. 1.2 Remove approximately 3.64 miles of 636 ACSR/AW. 1.3 Remove approximately 510ft of 1780ACSR/TW/AW 1.4 Remove approximately 3.74 miles of 7#9 Alumoweld wire. 1.5 Remove all facilities of existing structures marked for removal or replacement. 1.6 Install (38) new TPM-138R2 concrete structures (including flange connections) with direct embedment using crushed rock backfill. 1.7 Install (5) new TSM-138 S5-THETA steel structures with new caisson (drilled shaft) foundations. 1.8 Frame (38) new concrete structures with TM-1P-138L-1158, 138 kV Line Post Insulator Assembly. 1.9 Frame (5) new steel structures with TM-1-138A5-SIL-1158, 138 kV Double Dead-End Assembly. 1.10 Frame (2) existing steel structures (2J001A and 2J002) with TM-1-138A5-SIL-1158, 138 kV Double Dead-End Assembly. 1.11 Frame steel structure 2J001B with TM-1P-138S-1158, 138 kV Line Post Insulator Assembly. 1.12 Install approximately 3.76 miles of AFL DNO 3530 48-count fiber OPGW. 1.13 Install approximately 3.76 miles of 1158 ACSS 25/7 TW "Hudson" (Maximum operating temperature = 392F). 1.14 Install new overhead shield wire (7#9 Alumoweld) (1) from ahead span Burnt Store Substation to 2J001, (2) from ahead span Structure 2J043 to West Cape Substation Bus A, (2) from ahead span Structure 2J043A to West Cape Substation Bus C, and (1) from ahead span of West Cape Substation Bus B to Structure 2J050. 1.15 Install grounding and grounding rods for all new structures. 1.16 Return disturbed sidewalk to previous condition at Structures 2J033 and 2J042 after pole installation. 1.17 Transfer existing distribution conductors and equipment to transmission structures from 2J017 to 2J019. 1.18 Replace (3) existing concrete poles from 2J018 to 2J020 with distribution poles to house distribution service connections. 1.19 Relocate other Sub Surface Utilities or Utilities in conflict at locations as required (refer to SUE report). 1.20 Worksite must be restored exact to its pre-existing condition
Post-Bid
Communication
$10,000,000.00
Public - County
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 27, 2026
June 29, 2026
To be determined, North Fort Myers, FL
Related To This Project
North Fort Myers, FL
Bid Date: Apr 05 2019
North Fort Myers, FL
Bid Date: Apr 01 2026
North Fort Myers, FL
--
North Fort Myers, FL
Bid Date: Feb 13 2026
North Fort Myers, FL
Bid Date: Jan 23 2026
North Fort Myers, FL
--
North Fort Myers, FL
Bid Date: Jan 13 2026
North Fort Myers, FL
Bid Date: Dec 05 2025
North Fort Myers, FL
Bid Date: Dec 02 2025
North Fort Myers, FL
Bid Date: Dec 01 2025
North Fort Myers, FL
Bid Date: Nov 17 2025
North Fort Myers, FL
Bid Date: Oct 31 2025
North Fort Myers, FL
Bid Date: Sep 22 2025
North Fort Myers, FL
Bid Date: Oct 23 2025
North Fort Myers, FL
Bid Date: Oct 17 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.