Published March 11, 2026 at 8:00 PM

Updated March 12, 2026

Demolition and site work for a water / sewer project in Tacoma, Washington. Conceptual plans call for the demolition of a water / sewer project; and for site work for a water / sewer project.

The Port of Tacoma is soliciting Statements of Qualifications from firms interested in providing consultant services for the design, permitting, and construction support related to the demolition of the remaining shipway and piling at the Earley Business Center. The work will include coastal engineering to ensure the stability of the resulting low gradient shoreline. The contract period is expected to be approximately three years. Firms must agree to the Port's Standard Terms and Conditions, and any exceptions or alternative language must be identified during the question and response period. Statements of Qualifications submitted with altered or conditioned Terms and Conditions without prior written agreement will be considered non-responsive and not evaluated. Questions Due: Wed, 03/11/2026 - 02:00PM Contact: Michelle Walker, Procurement Analyst Site Visit Date: None E. SCOPE OF SERVICES The work may include, but is not limited to, the following tasks: 1. Site assessment and review of existing information including geotechnical information, drawings and other documents and available site information. 2. Coastal Engineering Analysis and Reporting including: a. Wind and wave analysis and modeling to assess wave attenuation provided by the existing pile field and potential impacts that may occur to the shoreline from the removal of the pile field. b. Hydrodynamic analysis and modeling c. Sediment transport analysis and modeling 3. Agency Coordination including City, State and Federal Agencies 4. Site investigation including: a. Sediment analysis associated with characterization of shoreline soil composition b. Benthic habitat investigation and mapping 5. Preparation of bid documents including plans and specifications for the removal of the shipway and ~ 13,000 wood piling a. 50%, 90% and 100% document sets are anticipated b. Associated reports and studies necessary for permitting, bidding and disposal 6. Permitting support 7. Bidding and construction support 8. Record drawing and completion reporting as may be required by the various permits 9. Other tasks associated with standard civil and coastal engineering that may be necessary to complete the design and preparation of the documents. Method of contractor selection has not been determined at this time.

Conceptual

Water / Sewer

$500,000.00

Public - City

Demolition, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
0
Bidding Soon
841
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 18, 2026

Project location map

To be determined, Tacoma, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.