BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 18, 2026 at 8:00 PM

Updated March 19, 2026

Site work for a water / sewer project in Deer Park, Illinois. Completed plans call for site work for a water / sewer project.

The project involves the construction of storm sewer improvements, ditch grading, and all necessary restoration at Lea Road and Circle Drive in the Village of Deer Park, Lake County, Illinois. The work is further defined in the contract documents prepared by Christopher B. Burke Engineering, Ltd. Bid proposals will be evaluated based on cost, past performance, experience, and ability to perform the work. The Village of Deer Park reserves the right to accept the proposal deemed to be in its best interest. Sealed bids are to be submitted at the Deer Park Village Hall. A pre-construction meeting will be held at the Village offices after contract execution by both parties.

Award

Water / Sewer

$325,540.00

Public - City

Site Work

25

5

9

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2026

April 17, 2026

Project location map

Lea Road and Circle Drive, Deer Park, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.