BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 12, 2026 at 8:00 PM

Updated March 18, 2026

Site work for a water / sewer project in Eel River Crossing, New Brunswick. Completed plans call for site work for a water / sewer project.

Reference Number NB-7395-26 In general, the work consists of decommissioning an existing sewage lift station and the supply and installation of a new duplex submersible sanitary sewage pumping station on rue d` Eglise. Tenders must be accompanied by the required amount of Security Deposit in the form of Surety (Bid) Bond in the amount of ten per cent (10%). Surety (Bid Bond) shall be made payable to the Village of Bois-Joli. The lowest/highest or any tender not necessarily accepted. Bid documents may be obtained only at the office of Boissonnault McGraw, 334 Dover Street, Campbellton, NB E3N 3M6, Tel.: (506) 789-1225 upon depositing the sum of one hundred dollars ($150.00) HST included, per bid set in the form of a certified cheque or cash payable to BOISSONNAULT McGRAW. Cost of tendering documents is non-refundable. Bid documents will be on display at the offices of Boissonnault McGraw, the Village of Bois-Joli and at the Construction Association Offices of Moncton, Freder

Post-Bid

Water / Sewer

$1,000,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
1
Bidding Soon
88
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2026

April 16, 2026

Project location map

Rue d'Église, Eel River Crossing, NB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.