Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 17, 2026 at 8:00 PM
Updated March 18, 2026
Site work and paving for a mixed-use development in Snohomish, Washington. Completed plans call for site work for a sidewalk / parking lot; water / sewer project; road / highway; for paving for a road / highway; sidewalk / parking lot; and water / sewer project.
The City of Snohomish is seeking a contractor to furnish all labor, tools, materials, and equipment necessary to complete the 13th Street and Park Avenue Intersection Improvements in Snohomish, WA. The work includes construction of new sidewalk, curb ramp, curb and gutter, paving, storm pipes, fire hydrants and associated water piping, flashing crosswalk beacons, permanent signing, and pavement markings as shown on the project plans and specified in the technical provisions. The scope also includes saw cutting, surface restoration, and other associated work. All bid proposals must be accompanied by a bid proposal deposit in cash, certified check, cashier's check, or surety bond in an amount equal to five percent (5%) of the grand total amount of the bid proposal, and a list of subcontractors. A one hundred percent (100%) Contractor's Performance and Payment Bond is required, to be delivered within ten (10) working days after notification of award to the successful bidder. A contract must be executed and returned to the City of Snohomish within ten (10) working days after notification of award. A certificate of liability insurance, specifically naming the City of Snohomish as an additional insured, must also be furnished within ten (10) working days after notice of award. The contractor may not commence work until all required insurance is approved by the City. The contractor is required to begin work within ten (10) working days after Notice to Proceed is issued and must complete construction within forty (40) working days. Liquidated damages will apply if the work is not physically completed within the allotted days. The City reserves the right to reject any or all bids and to waive irregularities or informalities in the bid or opening. Engineers Estimate: $250,000 - 300,000 Bid Package and technical related questions can be directed to Project Manager, Brennan Collins, at (425) 903-1812. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Roads / Highways
$300,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 12, 2026
April 13, 2026
Park Ave & 13th St, Snohomish, WA
Related To This Project
Snohomish, WA
Bid Date: Mar 20 2026
Snohomish, WA
Bid Date: Feb 19 2026
Snohomish, WA
Bid Date: Feb 27 2026
Snohomish, WA
Bid Date: Feb 24 2026
Snohomish, WA
Bid Date: Feb 06 2026
Snohomish, WA
Bid Date: Jan 21 2026
Snohomish, WA
Bid Date: Dec 31 2025
Snohomish, WA
Bid Date: Jan 20 2026
Snohomish, WA
Bid Date: Jan 20 2026
Snohomish, WA
Bid Date: Nov 25 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
