BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 27, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Missoula, Montana. Completed plans call for site work for a water / sewer project.

This project consists of installing approximately 606 linear feet of 8-inch SDR 35 PVC sanitary sewer main, two 48-inch sanitary sewer manholes, making connections to existing sanitary sewer manholes, disconnecting an existing sewer force main, abandoning electrical facilities, and decommissioning the Maloney Ranch STEP system along Lower Miller Creek Road and Bigfork Road in Missoula, MT. All restoration of disturbed areas including asphalt, concrete, gravel, landscaping, irrigation, and other miscellaneous work are included.

Bid Results

Water / Sewer

$354,938.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

27

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
7
Bidding Soon
123
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2026

April 17, 2026

Project location map

Lower Miller Creek Rd, Missoula, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.