Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 1, 2026 at 8:00 PM
Updated May 20, 2026
Site work for a water / sewer project in Ocala, Florida. Completed plans call for site work for a water / sewer project.
As of May 1, 2026 project was awarded to A & A Trucking and Excavating, awarded amount is $52,468.70 The City of Ocala requires the services of an experienced Contractor to provide demolition services for the Tuscawilla Park Alum Stormwater Treatment System equipment demolition. The project consists of demolishing the existing alum stormwater treatment system equipment located at Tuscawilla Park. The existing building containing the equipment shall be preserved, as well as the existing water and power connections. The base bid includes, but is not limited to: demolition and removal of the alum stormwater treatment system equipment, capping and abandonment of the existing connections to the system equipment, and preserving utility connections for the existing building. Contractors are responsible for providing all materials, labor, and equipment (in good working condition) to complete the demolition, removal, and hauling away of materials for this project. Contractors must use lead-safe practices during total demolition activities, have at least five (5) years' experience in stormwater treatment system equipment demolition services, and be licensed as a General Contractor in the State of Florida. Awarded vendors must provide a signed and notarized affidavit attesting not to use coercion for labor or services, in compliance with Section 787.06, Florida Statutes. Bidders must upload a completed Exhibit B - Price Proposal with their response and bid on all line items. The award will be made to the lowest, responsive bidder meeting all requirements outlined in the scope of work. Contractors must be willing to honor bid prices for at least 90 calendar days after bids are received and remain current in all obligations due to the City during the contract term. A bid bond in the amount of 5% is required. Piggyback Solicitation No Insurance Required No QA 3/30/2026 @ 5:00 PM EST
Award
Water / Sewer
$52,469.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
