BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 5, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a playground / park / athletic field in Revelstoke, British Columbia. Completed plans call for site work for a playground / park / athletic field.

This posting is the Stage Two of a two-stage solicitation process: the first stage was to evaluate the qualifications of all interested suppliers. The second stage (Stage Two) is to invite the qualified suppliers to provide further qualifications and a financial bid on the project based on the specifications and drawings. Only qualified suppliers have been invited to bid. Parks Canada requires removal and replacement of a diesel generator and fuel tank in Rogers Pass operational compound at Rogers Pass National Historic Site. The Rogers Pass operational compound is currently supported by two diesel generators that provide emergency power during utility grid outages. In coordination with Mount Revelstoke and Glacier National Parks, the project requires the removal and replacement of one existing 300 kW diesel generator to ensure continued reliability of standby power systems. This scope includes the complete decommissioning of the existing generator, followed by the procurement and installation of a new generator unit of equivalent or greater capacity. All associated mechanical and electrical integration work—such as fuel system connections, controls interfaces, structural mounting, commissioning, and final testing—is part of the project scope. In addition to generator replacement activities, the project requires the installation of a new 3,000 gallon fuel storage tank to support extended-power operation. A snow shelter structure must also be constructed to protect the tank from heavy winter snow loads typical of the Rogers Pass environment. Please contact the contracting officer to get the full solicitation documentation, access information on how to bid, or if you have any questions regarding this tender opportunity.

Post-Bid

Playgrounds / Parks / Athletic Fields

$1,000,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
1
Bidding Soon
61
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2026

May 19, 2026

Project location map

Rogers Pass National Historic Site, Revelstoke, BC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.