BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2026 at 8:00 PM

Updated May 20, 2026

Site work and new construction of an educational facility in Banquete, Texas. Completed plans call for the construction of a educational facility.

The Work of Project is defined by the Contract Documents and consists of the following 1. Abatement of asbestos in building and then full, partial demolition or relocation as noted on construction documents for the following a. Phase I 1) Old Elementary, Junior High Cafeteria, Classroom wing, Locker Room Building, Portable Building 01, Portable Building 02, Portable Building 03, Portable Building 04 and Existing Gymnasium building/structures. Storm Water Prevention Plan, sitework and grading to prepare site for new construction. b. Phase II 1) Existing Junior High School, Existing Band Hall, Portable Building 05 building/structures. Storm Water Prevention Plan, sitework and grading to prepare site for new construction. B. Type of Contract 1. Project will be constructed under a single prime contract. 2. Project will be constructed under a contract, prepared by CLK Architects, for proposed demolition. A copy of contract can be provided upon request to Architect. Bids are being accepted for the construction of a new Junior High School as part of the 2024 bond program, located at 4334 Fourth St., Banquete, TX 78339. Drawings and specifications are available and can be downloaded online or requested by email. Proposals may be mailed, emailed, or delivered in hard copy to CLK Architects & Associates, 802 N. Carancahua St., Suite 1350, Corpus Christi, TX 78401, Attn: Javier Huerta, AIA. Question Deadline 03/17/2026 at 2:00 PM CT

Award

Educational

$29,460,950.00

Public - City

New Construction, Site Work

26

11

55

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
32
Bidding Soon
439
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2026

June 1, 2026

Project location map

4334 Fourth St, Banquete, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.