Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 24, 2026 at 8:00 PM
Updated March 25, 2026
Site work, paving, outdoor lighting, new construction, renovation and addition to a mixed-use development in Gainesville, Georgia. Completed plans call for the renovation of a educational facility; for the construction of a educational facility; for site work for a educational facility; for outdoor lighting for a educational facility; for paving for a educational facility; and for the addition of a three-story above grade educational facility.
Johnson High School: Renovations to Johnson High School include a three-story classroom addition and replacement of the school’s auxiliary gym. The project has also seen renovation to some of JHS’s Career, Technical and Agricultural Education (CTAE) classrooms and updates to the school’s Learning Commons, which is the equivalent of a library or media center. The project is under the Parrish Construction Group. As of the last update, the building is constructed, with final touches such as signage and outer details underway. The district added that an accessible ramp to the building is in the process of being installed. North Hall High School’s improvements also include a three-story addition and replacement of its auxiliary gym. The renovation will move its main entrance to better meet the school’s administrative and security needs. The project will also connect the two buildings on campus, so students will no longer have to travel outside to get to classes. Additionally, renovations will update NHHS’s CTAE classrooms and will bring additional bathrooms to the campus. World Language Academy: The school has temporarily moved into the former Oakwood Elementary School campus. OES closed at the end of the previous school year in order to combine with McEver Arts Academy to form Everwood Elementary School. As of March 24, 2026, the project is currently under construction with completion timeline of 2027. Further details regarding design firm, construction manager, and general contractor have not been released.
Under Construction
Educational
$14,000,000.00
Public - County
Addition, New Construction, Outdoor Lighting, Paving, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2025
Multiple Locations, Gainesville, GA
Related To This Project
Gainesville, GA
Bid Date: May 07 2026
Gainesville, GA
Bid Date: Apr 30 2026
Gainesville, GA
Bid Date: Mar 26 2026
Gainesville, GA
Bid Date: Mar 26 2026
Gainesville, GA
Bid Date: Apr 02 2026
Gainesville, GA
Bid Date: Mar 26 2026
Gainesville, GA
Bid Date: Mar 23 2026
Gainesville, GA
Bid Date: Mar 19 2026
Gainesville, GA
Bid Date: Mar 05 2026
Gainesville, GA
--
Gainesville, GA
--
Gainesville, GA
Bid Date: Feb 26 2026
Gainesville, GA
Bid Date: Mar 04 2026
Gainesville, GA
Bid Date: Mar 19 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
