BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a mixed-use development in Cherry Valley, Illinois. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; and road / highway.

Proposals are being accepted for Cherry Valley Streets & Watermain Improvements, including the Old Orchard Subdivision, Genoa Street, E. State Street, and S. Ulster Street. The scope of work includes HMA surface removal, HMA full depth removal, HMA placement, concrete sidewalk removal and replacement, concrete curb and gutter removal and replacement, driveway removal and replacement, inlet adjustment, thermoplastic and paint pavement marking, street brick paver revitalization, watermain installation, and restoration. Bidders must submit a Contractor's Certificate of Eligibility and a certified check, cashier's check, or bid bond for not less than five percent (5%) of the total proposal. Prequalification categories must be relevant to the work. Construction money comes from local funds, and contractors will be paid monthly per completed work estimates. Use of local subcontractors, suppliers, and trades is strongly urged. Labor rates must comply with the General Prevailing Rate of Wages for the area. The Village reserves the right to reject any or all bids, waive information, or accept proposals in the Village's best interest. No bid may be withdrawn after opening without written Village consent for forty-five (45) days after bid closing. Adda 1 listed on REPO

Award

Roads / Highways

$3,000,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
671
Active Projects
437
Bidding Soon
5,616
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2026

April 27, 2026

Project location map

To be determined, Cherry Valley, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.